PROFESSIONAL SUMMARY
Overview
Work History
Education
Skills
Timeline

Russell McCarney

LTC Construction
Townsend,MT
24
years of professional experience

Dynamic Project Manager with extensive hands-on experience via self-employment and at LTC Construction, adept at delivering high-quality projects on time and within budget. Skilled in project planning and scheduling, I excel in fostering collaboration and ensuring customer satisfaction. Proven ability to manage resources effectively while maintaining safety and quality standards.

Work History

PROJECT MANAGER

2 Years 7 Months
LTC Construction | 03.2024 - Current
  • Successfully managed multiple projects simultaneously by prioritizing tasks according to urgency, resource availability, and alignment with organizational goals.
  • Planned, designed, and scheduled phases for large projects.
  • Met project deadlines without sacrificing build quality or workplace safety.
  • Acted as liaison between clients, subcontractors and stakeholders ensuring transparency and clear communication between all parties involved.
  • Developed comprehensive project plans with clear timelines, milestones, and budget requirements, ensuring timely delivery of high-quality results.
  • Delivered exceptional customer satisfaction by proactively addressing client concerns and meeting or exceeding expectations throughout the engagement process.
  • Document maintenance and generation including contract, change order and RFI submittal
  • Generated material lists (take offs), material procurement and established material logistics for all stages and trades of construction projects.
  • Functioned in a "Working Foreman" roll ensuring quality control, safety, job site efficiency and customer satisfaction.

CONTRACTOR

10 Years 1 Month
McCarney's Framing and Carpentry | 02.2014 - 03.2024
  • Performed pre construction job scope assessments, determining scope requirements including mitigation and new construction jobs.
  • Extensive window, siding (fiber cement and wood) and trim installation.
  • Initiated, performed and audited all aspects of rough framing including floor, wall and roof layout, truss and conventional stack.
  • Delivered outstanding service to customers to maintain and extend relationships for future business opportunities.
  • Managed multiple projects simultaneously while maintaining strict adherence to deadlines and budgets.
  • Coordinated timely delivery of materials and resources to job sites, preventing delays in project timelines.
  • Job site task delegation, quality control and implementation.
  • Established long-term relationships with clients, resulting in increased repeat business.

ELECTRICIAN

14 Years 5 Months
Abrams Electric | 05.2007 - 10.2021
  • Worked from ladders, scaffolds and lifts to install, maintain, or repair electrical wiring equipment and lighting fixtures in ceilings and roofs.
  • Installed and wired electrical transformers, service panels, and circuit breakers.
  • Installed, maintained, repaired, and tested equipment for electricity generation and utilization.
  • Planned layout and installation of electrical wiring, equipment, and fixtures based on specifications and applicable code.
  • Installed and programmed lighting control devices via use of Lutron Radio Ra2 and Radio Ra 3 software.
  • Inspected electrical systems, equipment and components to identify hazards, defects, and repair requirements.
  • Stored and maintained power tools and equipment for each job.
  • Used testing instruments such as voltmeters, and multimeters.

FRAMING LEAD

13 Years 9 Months
Fitzbuck Construction | 02.2003 - 11.2016
  • Delegated daily tasks to crews of up to five framers on any one given project.
  • Take off generation and material procurement by means of blueprint audit and site inspections.
  • Laid out, fabricated and constructed raised sub-floor systems by use of LVL, TJI and traditional Doug Fir lumber.
  • Laid out, fabricated and stood wall systems by use of traditional hand tools, pneumatic nail guns and power tools.
  • Installed all forms of Simpson framing hardware including seismic hold downs, hurricane straps/brackets, continuous strapping, MST straps, post caps and joist hangers.
  • Fabricated and installed roofing systems including Roof Truss and conventional stack systems.
  • Installed all forms of windows including Vinyl, Wood, Aluminum and Moving Glass Wall systems.
  • Installed exterior waterproofing envelope systems such as Tyvek and Moist stop Bituthene membrane products.
  • Fabricated and installed exterior trim and siding including Fiber Cement lap and board and Batten systems.

Education

Specialist Certificate - Computer Business Administration

Heald College, School of Business | Rancho Cordova, CA | 11-1999

Skills

Project management
Pre construction assessments
Project tracking
Microsoft Word
Estimating
Project planning
Project scheduling
Microsoft Excel
Microsoft Outlook
Take Offs

Timeline

PROJECT MANAGER

LTC Construction
03.2024 - CurrentRead More

CONTRACTOR

McCarney's Framing and Carpentry
02.2014 - 03.2024Read More

ELECTRICIAN

Abrams Electric
05.2007 - 10.2021Read More

FRAMING LEAD

Fitzbuck Construction
02.2003 - 11.2016Read More

Heald College, School of Business

Specialist Certificate from Computer Business Administration
Read More
Russell McCarney