Dynamic Project Manager with extensive hands-on experience via self-employment and at LTC Construction, adept at delivering high-quality projects on time and within budget. Skilled in project planning and scheduling, I excel in fostering collaboration and ensuring customer satisfaction. Proven ability to manage resources effectively while maintaining safety and quality standards.
Work History
PROJECT MANAGER
2 Years 7 Months
LTC Construction | 03.2024 - Current
Successfully managed multiple projects simultaneously by prioritizing tasks according to urgency, resource availability, and alignment with organizational goals.
Planned, designed, and scheduled phases for large projects.
Met project deadlines without sacrificing build quality or workplace safety.
Acted as liaison between clients, subcontractors and stakeholders ensuring transparency and clear communication between all parties involved.
Developed comprehensive project plans with clear timelines, milestones, and budget requirements, ensuring timely delivery of high-quality results.
Delivered exceptional customer satisfaction by proactively addressing client concerns and meeting or exceeding expectations throughout the engagement process.
Document maintenance and generation including contract, change order and RFI submittal
Generated material lists (take offs), material procurement and established material logistics for all stages and trades of construction projects.
Functioned in a "Working Foreman" roll ensuring quality control, safety, job site efficiency and customer satisfaction.
CONTRACTOR
10 Years 1 Month
McCarney's Framing and Carpentry | 02.2014 - 03.2024
Performed pre construction job scope assessments, determining scope requirements including mitigation and new construction jobs.
Extensive window, siding (fiber cement and wood) and trim installation.
Initiated, performed and audited all aspects of rough framing including floor, wall and roof layout, truss and conventional stack.
Delivered outstanding service to customers to maintain and extend relationships for future business opportunities.
Managed multiple projects simultaneously while maintaining strict adherence to deadlines and budgets.
Coordinated timely delivery of materials and resources to job sites, preventing delays in project timelines.
Job site task delegation, quality control and implementation.
Established long-term relationships with clients, resulting in increased repeat business.
ELECTRICIAN
14 Years 5 Months
Abrams Electric | 05.2007 - 10.2021
Worked from ladders, scaffolds and lifts to install, maintain, or repair electrical wiring equipment and lighting fixtures in ceilings and roofs.
Installed and wired electrical transformers, service panels, and circuit breakers.
Installed, maintained, repaired, and tested equipment for electricity generation and utilization.
Planned layout and installation of electrical wiring, equipment, and fixtures based on specifications and applicable code.
Installed and programmed lighting control devices via use of Lutron Radio Ra2 and Radio Ra 3 software.
Inspected electrical systems, equipment and components to identify hazards, defects, and repair requirements.
Stored and maintained power tools and equipment for each job.
Used testing instruments such as voltmeters, and multimeters.
FRAMING LEAD
13 Years 9 Months
Fitzbuck Construction | 02.2003 - 11.2016
Delegated daily tasks to crews of up to five framers on any one given project.
Take off generation and material procurement by means of blueprint audit and site inspections.
Laid out, fabricated and constructed raised sub-floor systems by use of LVL, TJI and traditional Doug Fir lumber.
Laid out, fabricated and stood wall systems by use of traditional hand tools, pneumatic nail guns and power tools.
Installed all forms of Simpson framing hardware including seismic hold downs, hurricane straps/brackets, continuous strapping, MST straps, post caps and joist hangers.
Fabricated and installed roofing systems including Roof Truss and conventional stack systems.
Installed all forms of windows including Vinyl, Wood, Aluminum and Moving Glass Wall systems.
Installed exterior waterproofing envelope systems such as Tyvek and Moist stop Bituthene membrane products.
Fabricated and installed exterior trim and siding including Fiber Cement lap and board and Batten systems.
Education
Specialist Certificate - Computer Business Administration
Heald College, School of Business | Rancho Cordova, CA | 11-1999
Skills
Project management
Pre construction assessments
Project tracking
Microsoft Word
Estimating
Project planning
Project scheduling
Microsoft Excel
Microsoft Outlook
Take Offs
Timeline
PROJECT MANAGER
LTC Construction
03.2024 - CurrentRead More
CONTRACTOR
McCarney's Framing and Carpentry
02.2014 - 03.2024Read More
ELECTRICIAN
Abrams Electric
05.2007 - 10.2021Read More
FRAMING LEAD
Fitzbuck Construction
02.2003 - 11.2016Read More
Heald College, School of Business
Specialist Certificate from Computer Business Administration