Summary
Overview
Work History
Education
Skills
Accomplishments
Timeline
Generic

Ryan Papenfuss

R&D Technician
Houston,MN

Summary

Dedicated professional skillful in sample collection, data recording and instrument calibration. Resourceful and adaptable individual with extensive experience developing and conducting experiments to document results for studies. Comfortable handling complex issues, meeting strict deadlines and adjusting to rapidly changing conditions.

Overview

29
29
years of professional experience
2
2
years of post-secondary education

Work History

R&D Technician

Miller Waste Mills
Winona, MN
06.2010 - Current
  • Coordinated sampling and analysis tasks to verify quality of finished products.
  • Troubleshot and resolved equipment and process issues.
  • Coordinated and managed laboratory projects and experiments.
  • Operated and performed preventative maintenance on laboratory equipment and instruments.
  • Assisted engineers by collecting and organizing laboratory data.
  • Participated in lab meetings and project presentations.
  • Coordinated quality assurance guidelines for laboratory work.
  • Trained and supervised junior technicians in laboratory protocols.
  • Recorded and analyzed data to produce reports of results.
  • Analyzed results using analytical software and created reports.

Laborer

River City Masonry
La Crosse , WI
04.2000 - 05.2010
  • Performed general housekeeping and cleaning tasks.
  • Loaded, unloaded, and moved material to and from storage and production areas.
  • Prepared job sites by removing debris and setting up materials and tools.
  • Used measuring tools such as gauges and tape measure to identify conforming parts during production.
  • Organized materials, tools, and equipment to supply team members.
  • Worked alongside team to accomplish work goals according to schedule.
  • Understood and followed verbal and written instructions to complete work correctly.
  • Utilized construction tools and machinery to effectively complete job site projects.
  • Assembled and disassembled formwork to facilitate correct shaping and pouring of concrete.
  • Followed proper equipment operation and maintenance procedures to keep equipment in good working condition.
  • Maintained organized and clean work areas at all times on job sites.
  • Followed instructions and safety protocols while operating machinery and equipment.
  • Managed safe and efficient use of tools and equipment on construction sites.
  • Used variety of hand and power tools to complete tasks.
  • Loaded and unloaded materials onto trucks and trailers.
  • Cleaned and maintained tools, equipment and worksites.
  • Provided labor support to carpenters, masons and other skilled trades.
  • Moved and cleared debris from work sites to dispose of in designated areas.
  • Operated forklifts and boom lifts to complete various tasks.

General Laborer

Isola
La Crosse , WI
06.1994 - 02.2000
  • Loaded, unloaded, and moved material to and from storage and production areas.
  • Performed general housekeeping and cleaning tasks.
  • Diminished workflow gaps by maintaining welded frame and steady material flow through production lines.
  • Led steel welding initiatives and completed sheet metal projects accurately.
  • Mentored new employees by providing guidance on safety and proper techniques.
  • Transported heavy materials using tugs, hand trucks and pallet jacks throughout work zone.
  • Notified supervisors of defective equipment or material.
  • Solved and identified any complex issues that impacted management.
  • Performed quality checks on products and materials to identify any defects.
  • Led inventory processes to minimize project lags.
  • Assisted team members with tasks that require group effort.
  • Followed written instructions to construct various types of equipment.

Education

Associate of Applied Science - Business Management

WWTC
La Crosse, WI
05.2004 - 03.2006

Skills

Multidisciplinary team collaboration

undefined

Accomplishments

I have been employed at RTP Company for 15 years now and for the last 5 years I have been in the position of R&D Technician. This has allowed me to gain experience understanding the process of U.L. projects and their complexity.

Timeline

R&D Technician

Miller Waste Mills
06.2010 - Current

Associate of Applied Science - Business Management

WWTC
05.2004 - 03.2006

Laborer

River City Masonry
04.2000 - 05.2010

General Laborer

Isola
06.1994 - 02.2000
Ryan PapenfussR&D Technician