Summary
Overview
Work History
Education
Skills
Timeline
Generic

Shane King

Iola,TX

Summary

Dynamic Superintendent with extensive experience at Cleaver-Brooks Sales & Service, excelling in project management and quality assurance. Proven track record in optimizing resource utilization and fostering teamwork, while implementing rigorous safety protocols. Skilled in Cogen and HRSG harp and bundle change outs, Boiler re-tubes and extensive repairs of Cogen, HRSG, watertube boilers and fire tube boilers to ASME code requirements from industrial to commercial customers. Knowledge in repairing and replacing high energy piping, 9 chrome and 2.25chrome. Major piping projects, Iso planning and fabrication drawings, Management and Leadership with a great work ethic.

References: Buster Brown. 843-458-7295 Xcelenergy

Shaun Chaddock 346-780-9743 CleaverBrooks

Josh Elliott 979-218-6939 Four E Precision Consulting

Mike Anderson 325-668-6816 BCA Energy

Overview

28
28
years of professional experience

Work History

Superintendent

Cleaver-Brooks
04.2020 - Current
  • Work on Major projects on cogen's and VU-60 boilers across the country
  • Managed multiple simultaneous projects while maintaining strict deadlines and adhering to budget constraints.
  • Established successful procedures for day-to-day operations and long-term planning.
  • Collaborated with architects, engineers, and contractors to achieve seamless project execution.
  • Implemented safety protocols for reduced workplace accidents and improved employee wellbeing.
  • Maintained safety onsite and upheld all OSHA regulations by [Action].
  • Enforced rigorous safety procedures during daily operations, creating a safe working environment for all personnel involved in the project''s execution process.

Superintendent

BCA Energy
02.2018 - 03.2020
  • Developed and enforced project timelines to enhance operational efficiency across job sites.
  • Analyzed project data to identify areas for improvement and optimize resource utilization.
  • Reviewed design specifications critically for accuracy, identifying potential issues before they escalated into costly delays or rework situations.
  • Resolved conflicts efficiently among team members, fostering a positive work environment that contributed to successful outcomes.
  • Reviewed iso and inspected ongoing construction to keep work in line with project goals.
  • Communicated effectively with clients throughout each stage of the project for transparency regarding progress updates as well as addressing any concerns raised promptly.

Rig Welder /Construction Superintendent

Conners Industrial
03.2012 - 01.2018
  • Fabricated and installed structural components according to specifications and safety standards.
  • Collaborated with project teams to develop efficient welding techniques and procedures.
  • Trained junior welders on best practices, fostering skill development and workplace safety.
  • Contributed to successful project completion by collaborating closely with other team members.
  • Developed strong relationships with clients by providing exceptional service and communication.
  • Reduced downtime by quickly troubleshooting and prompt decisions to resolve problems on the job site

Superintendent

Performance Contractors
04.2009 - 01.2012
  • Led project teams to ensure adherence to safety regulations and quality standards.
  • Streamlined workflows by implementing best practices in construction management.
  • Coordinated scheduling and resource allocation for multiple construction projects simultaneously.
  • Mentored junior staff, providing guidance on industry standards and operational procedures.

Combo Welder /Welder Foreman

Jerry Co Machine and Boiler
01.2006 - 03.2009
  • Fabricated metal components using MIG and TIG welding techniques to meet project specifications.
  • Inspected welds for quality assurance to ensure compliance with industry standards.
  • Operated plasma cutting systems for precise material shaping and preparation.
  • Collaborated with team members to troubleshoot equipment malfunctions and enhance workflow efficiency.

Combo Pipe Welder

BP Amoco
01.1998 - 11.2005
  • Fabricated and assembled piping systems according to engineering specifications.
  • Operated welding machinery, ensuring compliance with safety and quality standards.
  • Inspected welds for structural integrity, identifying and addressing defects promptly.
  • Collaborated with cross-functional teams to streamline production processes and improve efficiency.

Education

Educational Leadership And Management

Houston Area Safety Council
Deer Park, TX
02-2021

Welding

Bellville ISD
Bellville, TX
02-1995

Skills

  • Relationship building and management
  • Project coordination
  • Project management
  • Boiler re-tubes

  • Cogen bundles and service
  • Pipe fabrication and designing
  • Iso drawings
  • Mirror welding
  • Pipe welding
  • Gas tungsten arc welding
  • Plasma arc cutting
  • Pipefitting
  • Flux-cored arc welding
  • Aluminum welding
  • Gas metal arc welding
  • Oxy-fuel cutting
  • Personal protective equipment
  • Shielded metal arc welding
  • Welding positions
  • Welding symbols
  • Rigging techniques
  • Joint preparation
  • Blueprint reading
  • Quality control
  • Supply management
  • Welding inspection
  • Welding safety
  • Metal identification
  • Fabrication techniques
  • Teamwork
  • Teamwork and collaboration

Timeline

Superintendent

Cleaver-Brooks
04.2020 - Current

Superintendent

BCA Energy
02.2018 - 03.2020

Rig Welder /Construction Superintendent

Conners Industrial
03.2012 - 01.2018

Superintendent

Performance Contractors
04.2009 - 01.2012

Combo Welder /Welder Foreman

Jerry Co Machine and Boiler
01.2006 - 03.2009

Combo Pipe Welder

BP Amoco
01.1998 - 11.2005

Educational Leadership And Management

Houston Area Safety Council

Welding

Bellville ISD
Shane King