SIVA RAMA KRISHNA REDDY

Summary

Results-driven Mineral processing plant operational manager with over 29 years of experience in the Iron ore, Chromite and coal processing plants. A seasoned professional with proven track record of success, having worked in various countries and cultures such as USA, Chile and India. Gained expertise in laboratory, pilot plant test work, process flow sheet development,feasibility studies and green field/ brown field projects development and plants commissioning, operations.

Demonstrated record of success in building successful teams and managing profitable plant operations.

Overview

29
29
years of professional experience

Work History

Associate Vice President

Planck Holdings LLC
09.2018 - Current
  • Commissioned 500TPH green field met coal preparation plant, solved initial start up problems and achieved rated capacity within 6 months
  • Hired operational team and imparted training, set the operational procedures, set the process control parameters.
  • Prepared long term and short-term business plans for coal Preparation Plant and implemented the business Plan as approved by the President
  • Production cost reduced by improving equipment performance/ availability, developed local suppliers to replace OEM supplies and optimum utilization of resources
  • Which resulted in a total cost reduction of 15% for the company
  • Plant technical audit conducted and submitted ultra fine coal recovery project to the management for approval which increases overall yield by up to 6%
  • Reviewed the regulatory compliance of the coal preparation plant at periodic interval, coordinated statutory clearances through subordinate managers and facilitated the implementation of the suggestions/ violations pointed out by regulatory authorities
  • Replaced existing slurry tailings disposal system to combined refusal disposal system by implementing belt press and plate and frame technology, which gave additional 7 years tailings disposal area
  • Developed all the amenities /facilities at the plant for smoother and uninterrupted operations.

General Manager

JSW Steel Ltd
07.2016 - 08.2018
  • Achieved supply of 2.2MT of fluxes (Dolomite, limestone, quartz) to JSW steel plant from two different states
  • Lesioned with government and regulatory authorities to obtain clearances and certifications
  • Developed two new green field projects of limestone and Dolomite, obtained all the clearances and infrastructure developed
  • Onsite rake loading facility project developed and implemented for Bagalkot limestone
  • Successfully managed a group of 300 people at different locations/ projects and created healthy work environment, which resulted uninterrupted supply of fluxes to the steel plant at competitive price.

General Manager

JSW Steel Ltd
09.2015 - 06.2016
  • Explored the possibilities to develop iron ore mining and beneficiation in Goa
  • Studied existing iron ore mines in goa and their present status and EC limits
  • Identified the possible iron ore mines for joint venture or acquisition
  • Explored the availability of low-grade ore for beneficiation
  • Study the iron ore beneficiation practices/ plants and facilities
  • Study & identification of iron jetty points, barge loading/storage capacities and other infrastructure facilities
  • Evaluated Moitra coal washery data and flow sheet developed
  • Feasibility study and evaluation done on Degve Banda iron ore deposit.

General Manager

Santa Fe Mining
05.2008 - 07.2015
  • Magnetite ore Beneficiation)
  • Conducted Lab, pilot plant test work on Bellavista magnetite ore & developed flow sheet
  • Actively participated in 1MTPA Bellavista iron ore project basic & detail engineering, construction
  • Commissioned dry magnetite ore beneficiation plant and achieved designed capacity within six months
  • Lab and pilot plant test work done, and flow sheet developed for ESPERANZA project
  • The plant is commissioned in 2011
  • Lab and pilot plant test work done, and flow sheet developed for BELLASTER project
  • The plant is commissioned in 2013
  • Phosphorus liberation studies done for Bellavista mines, in house flow sheet developed, pilot plant test work done at MIMR, China and IMMT, BBSR India
  • Actively participated in 2.5MTPA wet plant feasibility study, Basic and detail engineering etc
  • At NERIN Engineering, China
  • 1MTPA operations, process control and transportation logistics
  • Implemented round the clock laboratory services at mines for iron ore testing and quality control
  • Generated revenue by providing services to neighboring mines like test work and flow sheet development
  • (8 flow sheets developed)

Head

Tata Steel Ltd
04.2006 - 05.2008
  • Control, Kalinga Nagar project, )
  • Conceptual flow sheet developed 2000TPH iron ore beneficiation plant for KPO project
  • Finalized the contracts for feasibility study and long-distance conveyors, utilities and plant EPCM
  • General health camps, eye cure camps conducted, and training needs identified for project-effected people
  • Carried out pilot plant studies at Joda iron ore beneficiation plant for Iron tailings filtration tests, Cyclones, magnetic separation and spirals, flotation, log washer, attrition scrubber
  • (Flotation, log washer, attrition scrubber test work is in progress)
  • Study of Iron ore fines by Floatex density separator at NML, JSR
  • Modifications and optimization of Chrome ore beneficiation plant for 30%Cr2O3 feed grade and technical support.

Senior Manager

Tata Steel Ltd
06.2001 - 03.2006
  • Operation and Process Control)
  • Sukinda Chromites Mines COB/LOP Plant
  • Overall operational and process control in charge for Chrome ore beneficiation plant and Lumpy ore beneficiation plant
  • Compliance to the systems like ISO 9000- 2000, ISO 14000, 18000 and SA 8000, TPM
  • Fulfilling market requirements and new products developments
  • People development and HR facilitator
  • Performance review, appraisals and training, safety & risk assessments
  • (World class work force)
  • Completed Brown-field project and responsible for Lab, Pilot plant testing and equipment selection, plant expansion
  • Annual business plans development, implementation and control and review
  • Plant safety, environment and health plans implementation, control, and review.

Engineer

M/S Sociedades de Fomento Industrial Ltd
08.1994 - 06.2001
  • Responsible for operations, process control of Iron ore Primary beneficiation sections I & II and secondary beneficiation section I&II operations
  • (Hematite, Magnetite)
  • Iron Ore slimes beneficiation plant operations, process control and circuit improvements/ developments
  • (HGMS/ MIMS/LIMS)
  • Quality control, R&D test Work, Sample preparation and equipment selection
  • Process water & tailings dam management

Education

M.A.Sc, M.Phil -

Gulbarga University
1994

Bachelor of Science - Geology

Gulbarga University
1990

Skills

  • HR Facilitator & people development
  • TIME Management
  • Influencing Skill
  • Negotiations skills
  • Problem solving and analytical skills
  • Open to learn and continuous improvement
  • Contract management
  • ISO systems internal auditor-(9000-2000,14000,18000 & SA 8000)
  • Total productive maintenance (TPM)
  • Qualified ASPIRE Green belt (Six Sigma)
  • Operational management
  • ERP / SAP

Timeline

Associate Vice President

Planck Holdings LLC
09.2018 - Current

General Manager

JSW Steel Ltd
07.2016 - 08.2018

General Manager

JSW Steel Ltd
09.2015 - 06.2016

General Manager

Santa Fe Mining
05.2008 - 07.2015

Head

Tata Steel Ltd
04.2006 - 05.2008

Senior Manager

Tata Steel Ltd
06.2001 - 03.2006

Engineer

M/S Sociedades de Fomento Industrial Ltd
08.1994 - 06.2001

M.A.Sc, M.Phil -

Gulbarga University

Bachelor of Science - Geology

Gulbarga University
SIVA RAMA KRISHNA REDDY