Installation FRP for Northern Natural
9 Oklahoma sites
17 Texas sites
70 miles of 16" pipe for Denbury.
Rehab on oil, gas and water lines inside plant for Kern River.
Completed testing, tie-ins and final cleanup On multiple sites for Northern Natural Gas.
40 miles of 24" pipe for Enterprise.
53 miles of 24" pipeline for Phillips 66.
9 miles of 12" pipe for Phillips 66
10 miles of 24" pipe for Kinder Morgan.
7 miles of 16" pipeline for Crestwood Energy.
1.5 miles of 16'' bore under Missouri River for Southern Star.
49 miles of 12'' pipeline for Highland Crude.
157 miles of 16'' pipe for Enterprise.
Supervised all road bores on project.
3 miles dual 36'' pipeline for Kern River Gas Company
1.5 dual take up and relay
Completed final tie-ins.
Hydro-testing, drying and cleaning pipe.
63 miles of 16" pipeline for Denbury. Supervised all road bores on project
180 miles of 4",6" and 8" steel gathering system for Saddlebutte Pipeline.
Conducted all Hydro testing
Installed road bores
8 miles of 8" and 6" pipelines for Excel Energy.
26 miles of 3",4" poly pipe as well as 2" and 4" flex pipe for El Paso Natural Gas.
Anomaly Verification Project for Kern River Gas Company.
Supervised installation of 6" fiberglass water produced line for El Paso Natural Gas in Vermejo Park Ranch.
20" integrity upgrade/replacement and directional bores for El Paso Natural Gas.
Installation of 10" Gathering system for Enterprise Products.
Set 30 miles of 20" and 30" pipe for Enterprise Products.
Two 24" directional bore and completed final tie-ins for Center Pointe
43 miles of 24" pipeline for Anadarko.
Hydro tested all pipe.
8 miles of 4" up to 12" Pipe for PXP Pipeline.
16 miles of 16" pipeline for MEG Energy.
20 miles of 8" and 16" Pipeline for Williams Energy.
multiple miles of 4" pipe up to 16" pipe on Bull Mountain for SG Interests.
Conducted all Hydro testing
27 miles of 12" and 16" pipeline for MEG Energy
Clearing foreman
Fencing Foreman
Conducted all testing
PIP Project including 16,000 of 30" and 36" pipe replacement.
2005 PIP Project for Northern Natural Gas in Minnesota & Iowa
22" class change replacement project for Williams Energy.
2003 PIP Project for El Paso Natural Gas.
876 miles of 30" pipe for El Paso Natural Gas
Rehab and Hydrostatic testing.
2002-2021 Sunland Construction LLC (superintendent, assistant superintendent, foreman)
1997-2002 Flint Engineering & Construction (Foreman, pipe construction / hydrostatic testing)
1980-1990 Flint Engineering & Construction (operator, truck driver)
1979- 1980 Flint Engineering & Construction ( Skilled Laborer)
1976-1982 United States Army & National Guard
Jim Hancox (662) 251-8869 (Retired Superintendent)
Paul Brown (505) 320-0909 (Retired Superintendent)
Jerry Rohde (702) 241-0562 (Retired Superintendent)
John Wilson (505) 860-1673 ( Estimator Project Manager)
Justin Andrews (903) 315-9164 (Small Business Owner)