Summary
Overview
Work History
Education
Skills
Certification
Assessments
Timeline
Generic

Steven Gutierrez

Summary

SEEKING LEAD RELIABLE TECH POSITION

15 YEARS+ OF COMBINED MECHANICLE MILWRIGHT AND MAINTENANCE. GOOD KNOWLEDGE OF MILLWRIGHT/MAINTENANCE TRADE PRACTICES INCLUDING RIGGING, ABLE TO INTERPRET BLUE PRINT DRAWING SCHEMATICS TO ASSEMBLE EQUIPMENT, STRONG COMMUNICATIONS, READING, WRITING AND MATH SKILLS. INVOLVED IN THE FIRST AMBASSADOR TRAINING PROGRAM TO SUCCESFULLY TRAIN AMBASSDORS IN BECOMING TALENTED TECH 2'S. EXHHIBITS STRONG TROUBLESHOOTING ABILITIES AND ADAPTABILITY, ENSURING EFFECTIVE RESPONCE TO EVOLVING TECH CHALLENGES.

Overview

12
12
years of professional experience
1
1
Certification

Work History

Tech 3

C&W Services
08.2022 - Current
  • PROMOTED TO TECH III AUGUST 1, 2022
  • I AM THE SHIFT LEAD IN MANAGING MY SERVICE TECHNICIANS IN THE INSTALLATION AND REPAIRS OF AUTOMATED PACKAGING AND DISTRIBUTION SYSTEMS
  • ALSO WORK IN CORRISPONDENCE WITH OPERATIONS TO KEEP A HIGH PERCENTAGE OF AVAILABILITY ON ALL EQUIPTMENT.
  • I AM THE SHIFT TRAINER TASKED WITH SCHEDULING TRAINING AND MENTORING ALL NEW AND VETERAN TECHNICIANS TO BUILD STRONGER TROUBLE SHOOTING AND REPAIR SKILLS.
  • I AM A CERTIFIED SUBJECT MATTER EXPERT FOR DEMATIC 2430 SL2 SORTERS & HIGHLY PROFICIENT IN SC3 SORTERS ALONG WITH AMBAFLEX SPIRAL AND INTRALOX EQUIPMENT.
  • ACTIVELY INVOLVED IN SUPPORTING AMM FLEX ROLES IN RUNNING SHIFT AS NEEDED.
  • ACTIVELY WORK WITH PARTS TEAM IN ORDERING PARTS ALONG WITH RESEARCHING AND COMMUNICATION WITH VENDORS.
  • ACTIVELY INVOLVED IN MONTHY MEETINGS WITH AMAZON SL2 GLOBAL PQM TEAM IN CURRENT PROCEDURES & PROCCESES, FUTURE PLANNING OF PROJECTS, AND TROUBLE SHOOTING DISCUSSIONS OF TROUBLED SITES.
  • MY EXPIERENCE AS A TECH 2 ALSO GOES ALONG IN MY EXPIERENCE WORKING AS MHE

Tech 2

C&W Services
11.2020 - 08.2022
  • WORKING ON DAMATIC AND WYN WRIGHT CONVEYOR SYSTEMS AT AMAZON FULFILLMENT CENTER
  • I HAVE A VAST KNOWLEDGE OF SL2 AND SC3 SORTERS
  • I HAD A SUCCESSFUL SHIFT LEAD ROLE OF OUR SHIPPING SL2 SORTER REBUILD WITHIN 6 MONTHS OF EMPLOYMENT
  • I HAVE TAKEN THE LEAD ON MANY PROJECTS AND REPAIRS WITH TIMELY SUCCESSFULL OUTCOMES
  • I ALSO POSSESS THE STRONG ABILITY TO TROUBLESHOOT, DIAGNOSE AND REPAIR PHOTO EYE SENSORS, VFD'S, MDR'S SMALL/LARGE ELECTRICAL MOTORS, AND GEARBOXES
  • ALSO COMPLETING DAILY, WEEKLY, MONTHLY, AND QUARTERLY PM'S TO ENSURE PROPER OPERATION OF ALL EQUIPMENT

Conveyor Belt Technician

S.A. Belting & Pulley
03.2020 - 11.2020
  • BUILD/REPAIR BELTS AND RUBBER COMPONENTS
  • INSTALL AND VULCANIZE LIGHTWEIGHT TO HEAVY WEIGHT CONVEYOR BELTING FROM BAKERY BOTTLING TO SAND AND GRAVEL COMPANIES
  • RESPONSIBLE FOR RECIEVING AND VERIFING INCOMING PARTS, MATIERIALS, AND SUPPLIES
  • MAINTAINING STOCK AREA, PREPARING SALES ORDERS, PICKING UP ORDERS STOCKS AND SUPPLIES
  • RESPONSIBLE FOR INSPECTING AND REPORTING DEFECTIVE EQUIPMENT, MATIERAL AND IMPROPER OPERATIONS OR UNUSUAL CONDITIONS
  • I HAVE EXPIERENCE IN CRIMPING AND MUNUFACTURING AIR, HYDRAULIC, GAS, & WATER HOSES, AND GASKETS OF MANY SIZES AND DIFFERENT MATIERALS

Maintenance Technician

Bonner Carrington
07.2019 - 04.2020
  • RESRONSIBLE TO PERFORM REPAIRS AND UPGRADES TO KEEP THE INTERIOR AND EXTERIOR OF APARTMENT COMMUNITIES IN FIRST-RATE CONDITIONS
  • RESPONSIBLE TO CLEAN AND REPAIR BUILDING FIXTURES INCLUDING LIGHTS, LOCKS, WINDOWS, DOORS, SCREENS, WALLS, FLOORS, GUTTERS AND DRIANS
  • PEREFORMED MAINTENANCE TASKS SUCH AS CARPENTRY, PAINTING, PLUMBING, ELECTRICAL CEILING FIXTURES, CLIMATE CONTROL SYSTEMS, AND GARAGE DOORS
  • RESPONSIBLE TO KEEP TRACK OF MULTIPLE WORK ORDERS AND REPAIRS WHILE PRIORITIZING EMERGENCIES AND BEING ON A NEEDED ON CALL SCHEDUALE DURING EVENINGS AND WEEKENDS

Millwright Lead

Zachary Construction Group
01.2018 - 05.2019
  • INSTALLING SKIDS WITH PUMPS AND MOTORS, LEVELING OF SKIDS AND ALIGNMENT ON EQUIPMENT ACCORDING TO BLUEPRINT AND TOLERANCE SPECIFICATIONS
  • ASSEMBLED CLARIFIERS AND INSTALLATION OF INTERNALS
  • PERFORMED CLEAN AND CLOSURE ON VESSELS
  • COORDINATED WITH OTHER CRAFTS AND DEPARTMENTS TO ACHIEVE SPECIFIC TASKS AND OBJECTIVES
  • PLANNED WITH LOTO DEPT TO VERIFY LOTO WAS PROPERLY IN PLACE TO ENSURE CREW WAS SAFELY ABLE TO WORK ON EQUIPMENT THAT WAS ALREADY TERMINATED
  • ALSO ISTC & PERMIT RECIPIENT TRAINED & CERTIFIED WITH EXXON MOBIL FOR THIS SITE

Millwright

Fluor Daniel Services
08.2016 - 12.2017
  • INSTALLING SKIDS WITH PUMPS AND MOTORS, LEVELING OF SKIDS AND ALIGNMENT ON EQUIPMENT
  • ASSEMBLED CLARIFIERS AND INSTALLATION OF INTERNALS
  • PERFORMED CLEAN AND CLOSURE ON VESSELS

Millwright/Maintenance

Mizkan Americas
03.2016 - 08.2016
  • ENSURES OPERATION OF MACHINERY AND MECHANICAL EQUIPMENT BY COMPLETING PREVENTIVE MAINTENANCE REQUIREMENTS ON ENGINES, PNEUMATIC TOOLS, CONVEYOR SYSTEMS, AND PRODUCTION MACHINES
  • FOLLOWING DIAGRAMS, SKETCHES AND OPERATIONS
  • SETTING AND ALIGNMENT OF MOTORS, PUMP TROUBLE SHOOTING AND REPAIRS, PIPE SYSTEM FABRICATION, AND PLANT LUBE SYSTEMS

Millwright/Maintenance

Mizkan Americas
05.2015 - 10.2015
  • ENSURES OPERATION OF MACHINERY AND MECHANICAL EQUIPMENT BY COMPLETING PREVENTIVE MAINTENANCE REQUIREMENTS ON ENGINES, PNEUMATIC TOOLS, CONVEYOR SYSTEMS, AND PRODUCTION MACHINES
  • FOLLOWING DIAGRAMS, SKETCHES AND OPERATIONS
  • SETTING AND ALIGNMENT OF MOTORS, PUMP TROUBLE SHOOTING AND REPAIRS, PIPE SYSTEM FABRICATION, AND PLANT LUBE SYSTEMS

Millwright

Saulsbury Industries
09.2014 - 12.2014
  • ASSISTED IN THE BOP AT POWER PLANT AND IN SETTING AND GROUTING ALL PUMP SKIDS AND FINAL ALIGNMENTS

Millwright

Jacobs Engineering S.A
08.2012 - 06.2014
  • INSTALLATION OF (4) SANDVIK CH870 CONE CRUSHERS AT THE FREEPORT MCMORAN MORENCI SECONDARY CRUSHING PLANT
  • RESPONSIBLE FOR FITMAN CHECK ON CH870 CRUSHERS PRIOR TI INSTALLATION
  • THIS WAS DONE BY COMPLETE ASSEMBLY AND TEARDOWN OF CRUSHERS PRIOR TO INSTALLATION
  • ASSISTED IN THE INSTALLATION OF NEW CONVEYOR SYSTEM INCLUDING DUST COLLECTION SYSTEM ON SEVERAL OF THE 55K EXPANSION PROJECT
  • ASSISTED IN ASSEMBLING AND INSTALLING NEW CYCLONE CLUSTERS INSIDE THE METCALF MILL AS PART OF THE 55K EXPANSION PROJECT
  • ASSISTED IN THE LAYOUT AND INSTALLATION OF THE NEW ROUGHER CELLS INSIDE THE METCALF MILL AS PART OF THE 55K EXPANSION PROJECT

Education

High School -

Deming High School
Deming, NM

Skills

  • Welding
  • Overhead crane operator
  • Technical rigging
  • General construction
  • JLG & MANLIFTS up to 150
  • Fabrication
  • Maintenance
  • Millwright
  • Mechanic
  • Industrial Maintenance
  • Pneumatics
  • Conveyor
  • Factory
  • Manufacturing
  • Basic Math
  • Heavy Equipment Operation
  • Blueprint Reading
  • Mechanical Knowledge
  • Plasma Cutting
  • Facilities Maintenance
  • Carpentry
  • Forklift
  • CMMS
  • Time management
  • Equipment repair
  • Materials handling
  • Microsoft Excel
  • Schematics
  • Crane
  • Micrometer
  • Communication skills
  • Conveyor installation
  • Leadership

Certification

  • Industrial safety training council, 01/01/19, 01/01/20
  • TWIC Card, 04/01/19, 04/01/24
  • NFPA 70E, 11/01/20, Present
  • SUBJECT MATTER EXPERT 2430 SL2, 05/01/24

Assessments

  • Mechanical Skills: Aptitude, Expert, 09/01/19
  • Basic Maintenance and Repair, Highly Proficient, 07/01/19
  • Workplace Safety, Proficient, 06/01/19
  • Basic maintenance and repair, Expert, 02/01/21

Timeline

Tech 3

C&W Services
08.2022 - Current

Tech 2

C&W Services
11.2020 - 08.2022

Conveyor Belt Technician

S.A. Belting & Pulley
03.2020 - 11.2020

Maintenance Technician

Bonner Carrington
07.2019 - 04.2020

Millwright Lead

Zachary Construction Group
01.2018 - 05.2019

Millwright

Fluor Daniel Services
08.2016 - 12.2017

Millwright/Maintenance

Mizkan Americas
03.2016 - 08.2016

Millwright/Maintenance

Mizkan Americas
05.2015 - 10.2015

Millwright

Saulsbury Industries
09.2014 - 12.2014

Millwright

Jacobs Engineering S.A
08.2012 - 06.2014

High School -

Deming High School
Steven Gutierrez