
My general experience has ranged from network structured cabling installations to outdoor fiber splicing. As a foreman for the last 10 years, I have learned the process involved to operate a safe and efficient project.
Projects include
Mass DOT CCTV/ signage fiber project 2009-2010
-fiber splicing/ testing approximately 30 miles of cable with multiple splice points on route 95.
Logan Airport 2010-2014
Mass General Brigham/ Childrens Hospital 2015-2024
-installation of multi-cell tube and cable for blown in fiber infrastructure. Terminations and testing.
Hyannis Windfarm project 2023
-terminate and test multiple fiber infrastructure cables in water tight fiber enclosures. The pathways from the power distribution site, through several manholes on the street required police detail scheduling and strict safety guidelines. The installation provided a monitor system for power generating windmills miles offshore.
Installed and maintained fiber optic systems.