Summary
Overview
Work History
Skills
Accomplishments
CERTIFICATIONS & TRAINING
Timeline
Generic

Todd Esplin

Reno,NV

Summary

Dynamic leader with a proven track record at Barrick Gold Corporation and Kinross Gold Corporation, adept in personnel management and complex problem solving. Spearheaded major projects, enhancing efficiency by up to 7-10% and leading a diverse team of 450+ personnel. Skilled in strategic planning and risk mitigation, excel in driving operational excellence and fostering team collaboration.

Overview

40
40
years of professional experience

Work History

Technical Director

I80 Gold
05.2022 - Current
  • Developing four mine sites into production. Overseeing all aspects of technical development and operational support. Two open pits and three underground mines.
  • Management of all technical reports, Feasibility Studies, Preliminary Economic Assessment, S-K 1300. Eight tech studies in progress, seven technical reports will be published in 2025
  • Resource modeling updates on six ore deposits at four mine sites
  • UG and Open Pit mine planning for the LOM
  • All aspects of Land management
  • Metallurgy: Updated metallurgical test programs for each site and deposits. Granite Creek and Ruby Hill metallurgical work completes in 2023-2025,
  • Water Rights management
  • Lone Tree Autoclave Process area restart feasibility study and optimization
  • Extensive Hydrology and Dewatering work completed at Granite Creek, Cove and Ruby Hill
  • Environmental permitting support and management

Mine Manager

Kinross Gold Corporation
02.2021 - 05.2022
  • Managed two open pits operations moving 118m tons year
  • Loading (four shovels & four large loaders)
  • Hauling (38, 793 haul trucks)
  • Drilling
  • Blasting
  • Support equipment
  • 130 M annual mining budget
  • 450 personnel in the department

Ore Processing Manager

Kinross Gold Corporation
07.2017 - 02.2021
  • Managed 35,000 GPM heap leach facility pumps, CIC, VCIC, Re-Usable Leach Pad, Two Strip Circuits & Refineries
  • 101 M annual processing budget
  • One billion tons of material on three large heap leach pads. Commissioned two new Leach pads.
  • Successful leaching of older areas with solution wells
  • Implemented tracking and logic systems to improve efficiencies by 5-7%
  • Project management oversite of 150 M in new projects
  • Phase W expansion oversite and technical contribution
  • Toll processing of loaded carbon

Principal Accounting Metallurgist

Barrick Gold Cooperation, Turquoise Ridge JV
08.2016 - 02.2017
  • Management of metallurgical accounting for TRVJ toll ore
  • Consolidation and management of metallurgical test work for LOM
  • Site analytical services

Human Resource Manager

Barrick Gold Corporation, Goldstrike Mine
03.2015 - 07.2016
  • Internally promoted from outside the HR field to manage all site-wide HR activities for 1,800 employees
  • Successfully focused on employee engagement and retention efforts, rebuilding positive corporate culture, and improving HR's effectiveness
  • Developed tracking and paperless approvals for HR systems

Process Autoclave Superintendent

Barrick Gold Corporation, Goldstrike Mine
04.2013 - 03.2015
  • Managed 13,000-ton-per-day Autoclave facility operation and maintenance (85 M budget, 120 personnel)
  • Relief Process Manager for over two years, Roaster, Autoclave, Metallurgical Services (450 personnel)
  • Implemented cornerstone habit of "housekeeping" improving morale, safety, and production
  • Eliminated bottleneck issues with Mercury off-gas system using cause mapping and team collaboration
  • Operated Autoclaves in alkaline and acid conditions
  • Completed several capital projects, Thickener containment, Acid area containment, Boilers and Autoclave scheduled rebuilds

Metallurgical Services Superintendent

Barrick Gold Corporation, Goldstrike Mine
01.2010 - 04.2013
  • Lead metallurgical and analytical team of 93 people in support of an 18,000 TPD roaster facility and 15,000 TPD autoclave facility.
  • Oversight of metallurgical accounting for autoclave, roster and toll ores
  • Completed TCM demo plant metallurgical and analytical test work
  • Provided single and double refractory ore evaluation

Process Services General Supervisor

Barrick Gold Corporation, Goldstrike Mine
01.2006 - 01.2010
  • Conducted contractor safety and compliance for 100 companies (500K hours annually)
  • Oversaw process area training department servicing over 450 employees
  • Performed risk management and taproot incident investigations

Analytical And Metallurgical Management

Tenneco Minerals, Echo Bay, Battle Mtn Gold, Barrick Goldstrike
01.1985 - 01.2006
  • Performed analytical and metallurgical work for several companies moving up into supervisory and managerial ranks

Skills

  • Personnel management
  • Complex problem solving
  • Flexible thinker
  • Staff training/development
  • Strategic planning
  • Recruitment and talent development
  • Effective leader & collaborator
  • Risk mitigation techniques

Accomplishments

  • 32 years in management positions
  • Improved utilization of lage mining fleet by 5%, 5.5 M tons per year improvement. 118 M tons in 2016
  • University of Nevada Reno ,The College of Business, Barrick Gold Senior Leadership Program 2015
  • Reduced Process area contractor safety incidents by 80%
  • Managed metallurgical accounting for over four years at Barrick Goldstrike
  • Increase Au production 65k ounces annually on leach pads with process solution management, VCIC, LLU, solutions wells
  • Chairman of Northern Nevada SME Mineral Process Conference 2023-2024
  • Received Nevada Mining Association's 2008 individual safety award, Awarded Barrick Gold's safety champion award - 2012
  • Performed TCM demo plant metallurgical and analytical test work
  • Improved on magnetic separation metallurgical work for roasting and autoclaving (patent achieved, published)

CERTIFICATIONS & TRAINING

  • Certified MSHA Safety Professional
  • Completed dozens of supervisory,managerial and coaching training courses
  • Attend many job skill development/training sessions each and every year

Timeline

Technical Director

I80 Gold
05.2022 - Current

Mine Manager

Kinross Gold Corporation
02.2021 - 05.2022

Ore Processing Manager

Kinross Gold Corporation
07.2017 - 02.2021

Principal Accounting Metallurgist

Barrick Gold Cooperation, Turquoise Ridge JV
08.2016 - 02.2017

Human Resource Manager

Barrick Gold Corporation, Goldstrike Mine
03.2015 - 07.2016

Process Autoclave Superintendent

Barrick Gold Corporation, Goldstrike Mine
04.2013 - 03.2015

Metallurgical Services Superintendent

Barrick Gold Corporation, Goldstrike Mine
01.2010 - 04.2013

Process Services General Supervisor

Barrick Gold Corporation, Goldstrike Mine
01.2006 - 01.2010

Analytical And Metallurgical Management

Tenneco Minerals, Echo Bay, Battle Mtn Gold, Barrick Goldstrike
01.1985 - 01.2006
Todd Esplin