Organized Manufacturing Engineer with over thirty years of experience. Deadline-oriented and a specialist in improving quality while significantly reducing cost. Dedicated to high-quality leadership with expertise working directly on the floor creating fast solutions with efficient in-person collaboration. As a team player, William listens keenly while formulating improvements that benefit both product and people. He is indefatigable and driven to work quickly and effectively on projects in all types of environments. William's colleagues consider him a visionary while he considers himself a "firefighter" and thrives on the front-lines.
Job Mission:
. Anticipate & Correct Production Issues.
. Reduce production costs.
. Establish zero error production.
Primary accomplishment, Developed new Liquid formulation for creating complex molds with unusual configurations. Over 50,000 in savings 1st year.
Developed new tools to reduce damage to end-use products during manufacturing. Over 100,000 in savings 1st year.
Developed new and improved manufacturing processes to reduce injury and better safety.
Daily responsibilities:
Review and improve the production floor matrix.
Identify areas for lean manufacturing techniques, concepts and processes. Managed daily safety and product improvement meetings.
SKILLS AND KNOWLEDGE:
747 Everett facility:
Provided forward looking support to anticipate issues in merging interior monuments at all workstations/control codes. Prepared Technical Decision Records (TDRs) that Evaluate, summarize, and make recommendations to airline customers related to Boeing Service Bulletins.
Prepared Engineering Orders (EOs), coordinated Job Card development, to support the incorporation of Boeing Service Bulletins on customer aircraft.
Coordinated multiple elements of the EO process with Maintenance Programs, Maintenance Planning, Materials Services, and Customers.
Assessed in correcting carbon fiber flap issues in Australia’s production line. (Root cause analysis.
Horizontal stabilizer integration with R&D, . BL40 ME stakeholder. In charge of developing the processes for installing the carbon fiber BL40 riblets. Signed off on all aspects of drilling methods and assembly processes and Manufacturing layup of the riblets. Signed off on all aspects of drilling methods and assembly processes and Manufacturing layup of the riblets, assisted in trouble shooting layup issues in planning. Developed gage reducing of material with C&C machining of Parts.
Floor beams. ME Liaison, assisted in working through the development planning, fabrication and assembly. Assisted in FAA certification, Worked with all aspects of tooling and tooling issues. Assisted in trouble shooting layup issues in planning. Worked in Gage reducing of material with C&C machining of Parts.
(Root cause analysis.) Worked extensively with developing the NOODLE that strengthens the T cord connecting the floor beam.
Worked with FAA Part 121 and Part 145 regulations related to operational and maintenance requirements for FAA regulations.
Assembled 32' Rocket PPV-1 prototype, worked through production issues with engineering.
Ability to thrive in environment of uncertainty
undefined