Summary
Overview
Work History
Education
Skills
Accomplishments
Affiliations
Timeline
Generic

William Wilson

Vermilion,OH

Summary

Dynamic leader with a proven track record at PPG Architectural Finishes, enhancing team efficiency and pioneering pilot plant operations. Excelled in training and mentoring, demonstrating adaptability and a commitment to excellence. Skilled in hazardous materials management and organizational skills, significantly contributing to continuous improvement and operational excellence.

Overview

33
33
years of professional experience

Work History

Pilot Plant Supervisor

PPG Architectural Finishes
09.2020 - Current
  • Boosted team efficiency by organizing, restocking and maintaining laboratory environments and equipment.
  • Documented experiment progress and observations, compiled data and organized findings for analysis.
  • Coordinated safe disposal of unwanted chemicals and cleaning apparatus.
  • Inspected and calibrated pH meters, spectrophotometers and centrifuges.
  • Developed strong relationships with vendors and suppliers, ensuring timely delivery of critical components or services required for uninterrupted pilot plant operations.
  • Ensured smooth project handovers from R&D teams to full-scale production facilities by sharing valuable insights and best practices derived from pilot plant operations.
  • Demonstrated adaptability by quickly learning new technologies and processes introduced within the facility to stay at the forefront of industry advancements.
  • Maintained a safe working environment by following strict safety protocols and ensuring proper handling of hazardous materials.
  • Continuously improved pilot plant operations through the implementation of lean manufacturing principles and best practices.
  • Skilled at working independently and collaboratively in a team environment.
  • Demonstrated respect, friendliness and willingness to help wherever needed.
  • Managed time efficiently in order to complete all tasks within deadlines.

SAP BOM Creation, BOM Maintenace

PPG Architectural Finishes
04.2012 - 09.2020
  • Upheld team reputation by demonstrating a strong work ethic and commitment to excellence in all aspects of the role.
  • Tested custom SAP transactions to verify proper functionality.
  • Created training documentation and provided training on standard and custom SAP transactions.
  • Trained and mentored junior staff on SAP system operations and functionality.
  • Performed internal system acceptance to deliver well-tested enhancements and meet business requirements.
  • Delivered successful SAP projects by collaborating with cross-functional teams and adhering to project timelines.
  • Conducted in-depth user training sessions to facilitate smooth adoption of newly implemented SAP systems.
  • Worked effectively in fast-paced environments.

Utility Operator

PPG Architectural Finishes
07.2002 - 04.2012
  • Examined incoming materials and compared to documentation for accuracy and quality.
  • Set up and ran machinery to produce exceptional products for industrial needs.
  • Calibrated machines to maintain required productivity levels and adherence to quality standards.
  • Trained new employees on company policies, equipment operation, and best practices, fostering a positive work environment and team cohesion.
  • Collaborated with Quality Assurance teams in conducting regular inspections of finished products, ensuring all items met established quality standards.
  • Trained new employees on proper machine operation, ensuring adherence to company standards and safety guidelines.
  • Participated in cross-functional teams focused on achieving company-wide goals related to safety, quality, and productivity improvements.

Chemical Reactor Operator

PPG Architectural Finishes
04.1992 - 07.2002
  • Ensured safe handling of hazardous materials, following strict guidelines and protocols at all times.
  • Played pivotal role during start-up/shutdown sequences, successfully executing necessary steps with precision accuracy.
  • Contributed to a culture of continuous improvement, participating in training programs for professional development.
  • Self-motivated, with a strong sense of personal responsibility.
  • Skilled at working independently and collaboratively in a team environment.

Education

High School Diploma -

Admiral King
Lorain, OH
06-1985

Skills

  • Training and mentoring
  • Standard Operating Procedures
  • Chemical Handling
  • Hazardous Materials Management
  • Waste Reduction
  • Time Management
  • Attention to Detail
  • Organizational Skills
  • Adaptability and Flexibility

Accomplishments

  • Supervised team of 3 staff members.
  • Achieved right first time by introducing SAP for BOM tasks.

Affiliations

  • United States Air Force Honorable discharge September 1989.

Timeline

Pilot Plant Supervisor

PPG Architectural Finishes
09.2020 - Current

SAP BOM Creation, BOM Maintenace

PPG Architectural Finishes
04.2012 - 09.2020

Utility Operator

PPG Architectural Finishes
07.2002 - 04.2012

Chemical Reactor Operator

PPG Architectural Finishes
04.1992 - 07.2002

High School Diploma -

Admiral King
William Wilson