Trim Carpenter
United Construction Group
Glendale, AZ
05.2020 - 03.2022
- Adhered closely to safety regulations when operating power tools.
- Inspected tiles, wall coverings or woodwork for breakage or damage.
- Maintained cleanliness of job sites throughout the duration of projects.
- Installed window sills, headers, door frames and jambs to specifications.
- Applied stains or paints to finished trim pieces before installation.
- Roughed in door and window frames or subflooring in structures undergoing construction or repair.
- Promoted compliance with applicable federal, state and OSHA laws and regulations.