Western Building Group
Maricopa,AZ
3
years of professional experience

Assistant Project Manager with 2+ years of experience supporting exterior building-envelope scopes on complex commercial and mission-critical construction, including semiconductor manufacturing plants and data-center facilities. Experienced in architectural metal facades, exterior skin systems, drawing and constructability review, budget setup/ management, schedule planning, submittals and RFIs, procurement, document control, field coordination, and labor tracking.

Work History

Assistant Project Manager

2 Years 7 Months
Western Building Group | 03.2024 - Current
  • Selected projects: TSMC Semiconductor Campus, QTS Data Center, Astria at 217 East 7th, Shorehaven Towers, San Luis Border Station, ASU Polytechnic, Hayden Ferry Roman Restaurant, and New Vision Bank
  • Coordinate ACM/MCM, insulated wall panel, weather-barrier, louver, coping, flashing, and trim scopes across multi-building commercial and mission-critical projects.
  • Review architectural, structural, cold-formed steel, shop-drawing, bulletin, and engineering-calculation packages for dimensions, joint layouts, system depth, attachment framing, span requirements, constructability, and scope alignment.
  • Manage submittals, RFIs, substitution requests, samples, custom-color approvals, engineering documents, revision logs, meeting records, field photographs, QC documentation, and change-order backup.
  • Perform material takeoffs, obtain vendor pricing, issue purchase orders, and coordinate long-lead releases for panels, extrusions, flashings, trims, fasteners, sealants, and installation accessories.
  • Coordinate with general contractors, architects, engineers, detailers, manufacturers, vendors, subcontractors, superintendents, and field crews to resolve design, access, sequencing, quality, and material issues.
  • Developed an Excel labor and production tracker for an eight-figure, multi-phase TSMC facade program, combining budgets, burdened labor costs, crew data, installed quantities, and daily reports by building and scope for weekly performance reviews.
  • Led day-to-day coordination for the Hayden Ferry Roman Restaurant project from turnover through procurement, installation support, documentation, and closeout, under the direction of the project manager.
  • Supported design-assist delivery of perforated aluminum security gates at San Luis Border Station, using RFIs to resolve hardware, perforation, steel-frame, and attachment details and coordinating specialty fabrication through field installation.

Window Technician

3 Months
Sonoran, a Kleen Tech Company | 12.2023 - 03.2024
  • Completed commercial window-cleaning assignments while maintaining work schedules, service records, equipment readiness, site coordination, and required safety practices.

Education

High School Diploma

Algoma High School | Algoma | 05-2017

Skills

Budget / Financial: Project budget setup and monitoring
schedule of values (SOV) preparation
labor and equipment cost tracking
cost control
and change-order support.
Software Proficiency: Microsoft Excel
Project
Word
PowerPoint
and Outlook
Bluebeam Revu
Autodesk Construction Cloud / BIM 360
Procore
Trimble ProjectSight
and CMiC
to manage project records and support workflow.
Project Collaboration: Working with clients
architects
general contractors
and adjacent trade partners to resolve design issues
coordinate trade sequencing
and meet project requirements.
Document control: Drawing and revision tracking
submittal and RFI log management
approval tracking
meeting records
and organization of project correspondence
QC records
and change-order documentation.
Problem-solving: Identifying constructability issues
resolving drawing and scope discrepancies
evaluating alternatives
and coordinating practical solutions with project and field teams.
Time management: Prioritizing competing project demands
tracking deadlines
coordinating submittals and material releases
and organizing daily work to meet project milestones.

ADDITIONAL EXPERIENCE AND EDUCATION

  • SMSB Consulting - Data Registration and Planogrammer
  • Appleton, WI | 2019 - 2021
  • Accounting experience - Mr. Neubert Construction and Seth Robertson CPA | 2017 - 2018

Timeline

Assistant Project Manager

Western Building Group
03.2024 - CurrentRead More

Window Technician

Sonoran, a Kleen Tech Company
12.2023 - 03.2024Read More

Algoma High School

High School Diploma
Read More
CALEB BROWN