I am a self motivated person that likes to stay busy. While at the steel mill I was placed into various roles and always strived to succeed and was rewarded with leadership opportunities. I like fast paced with critical thinking work. I enjoy looking at problems and finding solutions that are practical and cost efficient while being safe and stream line production of a facility.
Overview
20
20
years of professional experience
Work History
Support Group Leader
ASI
Alton, IL
03.2011 - 03.2026
Supervised daily shop operations, ensuring adherence to safety protocols and quality standards.
Trained new staff on equipment usage and operational procedures to enhance team efficiency.
Coordinated inventory management, maintaining optimal stock levels and minimizing waste.
Implemented process improvements that enhanced workflow efficiency and reduced downtime.
Coordinated contractors to specific jobs and materials.
Worked closely with management to ensure ongoing operations and future maintenance work
Equipment maintenance and safe operation and the grounds and roads where maintained
Monitored performance metrics, providing feedback to optimize individual and team productivity.
Led cross-functional teams to streamline shop processes, improving overall operational effectiveness.
Aerial Lineman Foreman
Gaylord Utility Contractors
Des Moines, IA
01.2009 - 03.2011
Supervised crew members in installation and maintenance of overhead and underground utility systems.
Coordinated daily work schedules to optimize crew efficiency and project timelines.
Ensured compliance with safety regulations, reducing workplace incidents and promoting a safe work environment.
Conducted quality inspections to maintain high standards in utility installations and repairs.
Trained new linemen on safety protocols, tools usage, and operational best practices.
Collaborated with project managers to assess site conditions and determine resource requirements.
Implemented process improvements that enhanced workflow efficiency and reduced downtime for projects.
Led team meetings to discuss project progress, address challenges, and align on goals for successful execution.
Assisted in the recruitment of qualified linemen for the team by conducting interviews and evaluating candidates based on skills assessment tests.
Supervised crews in diverse weather conditions while maintaining a focus on safety, quality, and productivity.
Enhanced team performance with ongoing training, skill development, and mentoring initiatives.
Conducted comprehensive pre-job briefings to ensure that all crew members understood their roles in accomplishing the day''s objectives.
Optimized workflow by coordinating closely with other departments and contractors for seamless task execution.
Completed projects on time and within budget through effective resource allocation and project management.
Read and interpreted plans, prepared supplies and developed effective plan of action before beginning work.
Analyzed preparation documents to correctly set up installations at job sites.
Set ground anchors and guying systems for utility poles.
Strung cables between structures and lines from poles, towers, or trenches and pulled lines to proper tension.
Measured pole attachments and completed proper fitting and construction according to NESC guidelines.
Monitored daily progress and work quality to provide guidance and direction to mechanics and installers.
Kept watchful eye on equipment inventories, optimizing work readiness and aligning supplies with specifications for each job.
Track Maintenance Foreman
RailWorks Track Systems
05.2006 - 02.2011
Supervised daily maintenance operations, ensuring adherence to safety protocols and operational standards.
Coordinated equipment inspections and repairs, reducing downtime and enhancing system reliability.
Trained junior staff on maintenance procedures and best practices, promoting skill development and team cohesion.