Dedicated Data Center Technician with extensive hands-on experience supporting hyperscale AI and enterprise data center environments across multiple U.S. locations. Proficient in structured cabling, fiber optic installations, and Cat copper cabling, along with comprehensive rack and stack operations that ensure optimal cable routing and dressing for robust physical network infrastructure. Demonstrated ability to thrive in live production environments while upholding safety, quality, documentation, and customer standards. Contributed to CoreWeave AI infrastructure projects and Microsoft data center deployments through Nebius, showcasing a commitment to excellence in high-demand settings.
Work History
Dakota / Ellendale, ND
Myriad360 | 08.2026 - Current
Contributing to the successful implementation of CoreWeave AI data center infrastructure to enhance operational capabilities.
Conducting comprehensive rack and stack operations, ensuring optimal setup of structured cabling and hardware components.
Installing fiber optic and Cat copper network connections.
Performing cable routing, dressing, loop management, and tray organization.
Supporting cable testing, documentation, and quality control procedures.
Microsoft Project
1 Month
Nebius | 07.2026 - 08.2026
Coordinated efforts for Microsoft data center infrastructure deployment to ensure seamless integration and functionality.
Executed rack and stack installations and hardware deployment with precision.
Oversaw installation processes for fiber optic and Cat6 copper network cabling, ensuring optimal performance and reliability.
Streamlined cable organization and routing practices to ensure optimal patch panel functionality and accessibility.
Adhered to Microsoft quality, safety, and documentation standards to ensure compliance and operational excellence.
Facilitated physical connectivity troubleshooting and verification processes.
CoreWeave Project
Myriad360 | 07.2026 - 07.2026
Managed logistics and resources for infrastructure deployment activities, ensuring timely and effective implementation.
Executed rack installation, cable routing, and network connectivity tasks with precision.
Supported physical layer troubleshooting efforts to ensure system reliability.
Conducted regular reviews of documentation and installation processes to maintain high quality standards.
CoreWeave Project
1 Month
Myriad360 | 06.2026 - 07.2026
Led initiatives for CoreWeave data center expansion projects.
Performed installation of fiber optic jumpers and Cat6 copper connections, ensuring optimal connectivity and system efficiency.
Executed cable routing, dressing, loop installation, and tray organization tasks.
Performed comprehensive cable testing and connectivity verification to support reliable communication infrastructure.
Monitored and optimized rack layouts and structured cabling standards for improved system performance and reliability.
CoreWeave Project
1 Month
Myriad360 | 05.2026 - 06.2026
Facilitated deployment of high-density compute infrastructure to enhance operational efficiency.
Configured and arranged fiber optic cabling infrastructure to ensure optimal network performance between racks and equipment.
Managed cable routing and maintenance within trays to uphold standards of cable management and operational efficiency.
Completed detailed labeling documentation and verified physical connectivity to maintain system reliability and performance.
Supported operational efficiency by assisting with equipment installation and conducting readiness verifications.
CoreWeave Project
2 Months
Myriad360 | 03.2026 - 05.2026
Oversaw the implementation of large-scale AI data center infrastructure projects, ensuring alignment with CoreWeave's strategic objectives.
Executed rack and stack operations while ensuring optimal physical connectivity verification.
Achieved seamless connectivity by installing LC-LC fiber connections and CAT6 copper network cabling. Enhanced network infrastructure through the successful installation of LC-LC fiber connections and CAT6 copper network cabling.
Managed routing and organization of cables through trays according to project diagrams.
Managed cable dressing and rack organization to optimize equipment accessibility.
Performed cable testing and verified installation quality to maintain operational excellence.
Data Center Technician (Contract)
1 Month
Myriad360 | 02.2026 - 03.2026
Managed installation and routing of fiber optic and CAT copper network cabling, ensuring optimal performance for data center operations.
Executed routing of cables through overhead cable trays in alignment with engineering drawings and cable plans.
Managed cable organization and service loop processes to ensure optimal functionality.
Implemented structured installation of cable bundles through the application of cable management systems, incorporating mesh routing solutions for optimal organization.
Performed detailed quality inspections and completed accurate cable labeling documentation to maintain operational integrity.
Maintained orderly and tidy cable pathways to support efficient data center operations.