With more than two decades of experience in the petrochemical industry and extensive hands-on work as a Rope Access NDE Technician, I bring a proven record of precision, safety, and reliability. Having mastered inspection methods such as UT, MT, and PT, I am eager to transition these skills into the field of instrumentation. I am particularly interested in the Instrumentation Technician role because it aligns with my strengths in troubleshooting, calibration, and ensuring operational integrity in high-stakes environments.

Overview

23
23
years of professional experience
1
1
Certification

Work History

Rope Access NDT Technician

Team
01.2022 - Current
  • Perform various non-destructive examination (NDE) methods including MT, UT, and PT as a certified Rope Access Level 2 Technician.
  • Supported inspections at Dow Freeport, NRG Limestone, Parish, Cedar Bayou, LNG Freeport, and other Gulf Coast plants.
  • Conducted inspections on piping, vessels, turbine blades, and structural components to detect flaws and ensure compliance.
  • Maintained safe and organized work areas while adapting to diverse inspection environments.
  • Provided accurate reports and collaborated with site supervisors and engineers to resolve inspection findings.
  • Successfully obtained NCCER Instrumentation certification while working full-time as a Rope Access NDE Technician, demonstrating initiative, dedication, and career advancement toward instrumentation.

Building Inspection Specialist

Goose Creek CISD
10.2020 - 08.2021
  • Worked closely with local and county Fire Marshals to improve Fire Code compliance issues throughout the school district.
  • Performed preventative maintenance inspections district wide on buildings, bleachers, parking lots, fire hydrants, and playgrounds, reporting all findings to the Director of Maintenance.
  • Kept team on track by providing assistance with their activities and giving constructive feedback.
  • Demonstrated leadership by making improvements to work processes and inspections.
  • Resolved interpersonal conflicts by listening, finding common ground and building relationships.
  • Handled all delegated tasks, including the creating of handicap, towing, no parking signs and the installation of said signs.
  • Contributed to development, planning and completion of inspection initiatives.

Rope Access Site Lead

PetroChem Inspection
01.2019 - 01.2020

As Rope Access site lead, my main responsibility was to provide a safe and productive work environment for my NDT rope access technicians while providing accurate ultrasonic thickness inspection data to our customer. Assisted LyondellBasell's Senior Inspectors by providing daily UT thickness updates, provide insight on our day to day activities, learning of Ultra Pipe and Meridian programs and building of inspection packages.

Rope Access Level 3 NDT Crew Lead

Acuren Inspection
05.2018 - 12.2018

  • As level 3 IRATA Rope Access Supervisor at ExxonMobil Baytown, I oversaw various rope access activities. Installed UT ports, removed & installed insulation for CUI inspection, obtained UT data and provided site manager with daily NDT reports.

Rope Access Site Supervisor

Team Industrial Services Inc
05.2017 - 05.2018
  • As level 3 IRATA Rope Access Supervisor at Valero Port Arthur, I managed CUI and baseline work for Rope Access. Among tasks that I performed were the installation of UT ports, removing & installation of insulation for CUI inspection. Provided site manager with daily progress reports, performed quarterly inspection on all rope gear and kept inventory of materials and other pertinent tools.
  • Upon completion of the project at Valero Port Arthur, I was put in charge of an RTR job at Flint Hills Houston where our crew performed RTR on over 2,500 ft of piping all via Rope Access. Provided unit inspectors with daily field reports and time sheets.

SPRAT/IRATA Level 1 Tech

Acuren Inspection
09.2014 - 05.2017


  • As a level 1 IRATA Rope Access Tech, I performed various tasks that ranged from the removal & installation of insulation, NDE (API) inspection at Westlake Chemical and performing X-Rays at ExxonMobil Baytown & Beaumont, Lyondell Chanellview, Shell Norco.
  • By obtaining my 40 hour Radiation Safety certification, I was able to assist Radiographers in taking profile X-rays on ground and via rope access.
  • I also gained over 1000 on the job hours in ultrasonic thickness testing.
  • Obtained my NCCER in Industrial Insulation.
  • Worked directly with Alliance Phillips 66 Maintenance Manager in Belle Chasse, Louisiana to perform a CUI job that included the removal of 150' of insulation and performed visual inspections on the line.
  • Inspected and updated all required materials needed for a project at PRSI in Pasadena, TX where we would perform rope access in order buff and grind the head of a vessel in order for our API to perform his inspections 
  • Supported Rope Access Mechanical Operations Manager with daily operational functions while on call out jobs.

Scaffold General Supervisor

Mobley Industrial Services
05.2013 - 08.2014
  • As the scaffold general foreman, I was assigned to the Purity Ethane Project at Chevron Cedar Bayou to provide scaffold support for S&B Engineers.
  • With my planning and experience, we were able to turn a $150,000 contract into a $675,000 scaffolding project.
  • My duties included holding daily safety meetings with our scaffolding crew, assigning lead-men their daily tasks, provide the customer with accurate scaffold logs along with their monthly billing report.
  • I worked directly with operations to obtain permits associated with various tasks including confined space and general work permits.

Scaffold Supervisor

Performance Contracting Inc
01.2012 - 05.2013
  • As scaffold supervisor my responsibilities include but not limited to the following
  • Completed tear-down of existing structures and prepared for new construction.
  • Accurately estimated time and materials costs for projects.
  • Provided accurate scaffold measurements and estimates for all projects I was assigned to.
  • Requisitioned new safety supplies and scaffold equipment.
  • Consistently assumed additional responsibilities and worked extended hours to meet project deadlines.
  • Monitored inventory and reported scaffold material to be restocked for each job.

Scaffold Supervisor

Brand Energy & Infrastructure
06.2011 - 01.2012
  • As a scaffold supervisor during the OP 3 Turnaround at Shell Deer Park, my responsibilities included but not limited to the following
  • Completed tear-down of existing scaffolds and prepared for new construction.
  • Accurately estimated time and materials costs for projects I was assigned to.
  • Provided accurate scaffold measurements and estimates for all projects.
  • Consistently assumed additional responsibilities and worked extended hours to meet project deadlines.
  • Took the initiative to prepare and clean construction sites by removing debris and other safety hazards.

Austin Industrial

01.2011 - 06.2011
  • As a working scaffold builder foreman / supervisor, held daily safety meetings, obtained permits, submitted timesheets.
  • I took the initiative to produce work accurately and on time.

Mobley Industrial Services
04.2010 - 12.2010
  • As Scaffold supervisor at Chevron Cedar Bayou my duties included supervising a crew of up to 10 scaffold builders during turnaround at Chevron Cedar Bayou.
  • Tasks also included submitting timesheets and daily safety reports.
  • Assigned to a different jobsite, the duties performed there were as follows: taking progress on insulation and paint at the FRAC 4 Project at Enterprise Chemical Plant.
  • Create progress reports and insulation inventory Excel spreadsheets for the client.
  • The use of ISO's and P&ID's were necessary to locate lines, give insulation and paint spec information to all foremen.

Performance Contracting Inc
02.2010 - 04.2010
  • Duties as a Scaffold General Foreman included providing scaffold and insulation support at various plants, such as a turnaround in San Miguel Power Plant in Christine, TX; CEMEX Concrete Plant and Guadalupe Power Plant.
  • Meet daily with contractor and client to give daily progress on work being performed.
  • Submitted timesheets on a weekly basis, held daily safety meetings with crew and submitted daily safety reports to client.

United Scaffolding
01.2009 - 01.2010
  • As a working supervisor, responsible for running a crew of up to eight (8) people at a project at INEOSNOVA.
  • Duties include but are not limited to: obtaining permits, estimating time and material projects, updating scaffolds, dealing first hand with operations, client and contractor.
  • At times, assisted / worked with crew to promptly and accurately build scaffolds within a certain time frame.

Scaffold Superintendent

L & H Services, Inc
09.2007 - 02.2009
  • As a Supervisor overseeing the scaffold and insulation department for a project at OxyVinyls Deer Park, I was responsible for running crew, submitting timesheets, spreadsheets including inventory of material, and dealing directly with operations, clients and contractors.
  • Other tasks include being responsible for running lump sum jobs, maintenance, and following through that all projects are completed in a timely manner.

Scaffold Specialist. Crew leader

Miken Specialties
05.2007 - 07.2007
  • for up to 6 craftsmen, completed JSA's, held weekly safety meetings, obtained permits from operations, and always took the initiative to start the jobs.

Protherm Services
12.2006 - 05.2007
  • As a scaffold foreman at Lubrizol my responsibilities were but not limited to the following: Supervised daily work of a crew composed of 4 to 6 craftsmen, submitted timesheets in a timely manner, build sheets.
  • I kept a list of material, inventory of scaffold material.
  • While there, I was in charge of job at Lubrizol Chemicals.
  • At times, I assisted builders in order to complete job within a reasonable time frame.

Foreman

I & I - Insulations Incorporated
01.2006 - 12.2006
  • Running crew of 20 co-workers, obtaining permits from Valero operations.
  • Fill out JSA's, hold safety meetings on a daily basis (Spanish & English), and among other things conducted weekly safety audit (walk through) with safety representatives from Jacobs and Valero.
  • Also became familiar with reading ISO's, P & ID's and Flow sheet diagrams.

Scaffold Journeyman

Mobley Industrial Services
10.2005 - 01.2006
  • Scaffold Builder - Building, modifying, and dismantling scaffolds for Austin, Lyondell operations and Kellogg Brown & Root.
  • Gained experience with all process equipment.
  • Additionally, obtained permits from Lyondell operations completed and reviewed JSA's with crew.
  • Completed tear-down of existing scaffolding and restocking of materials.

EMSI
11.2003 - 09.2005
  • At EMSI, I performed duties such as: Daily monitoring of emission leaks in valves, compressors, pumps and other process equipment.
  • Worked with maintenance personnel in order for them to repair leaks and; therefore, became familiar with the process equipment.

Rope Access NDT Technician

Team Industrial Services Inc
01.2022 - Current
  • Performed various NDT methods at Dow Freeport via rope access per customer specs and maintained safe work environment daily.
  • Performed visual and ultrasonic inspections at NRG power plant boiler and duct work, assisting API with reports.
  • Kept working areas clean and safe with appropriate equipment and supplies to meet expected shop and customer demands.
  • Quickly learned new skills and applied them to daily tasks, improving efficiency and productivity.
  • Carried out day-day-day duties accurately and efficiently.

ASI - Anderson Industrial Services
07.2003 - 10.2003
  • Tasks include: Scaffold apprentice - building, erecting and dismantling scaffolds.

PCI - Performance Contracting, Inc
10.2002 - 06.2003
  • Scaffold and Insulation crew helper - I assisted scaffold builders and insulators with facilitating materials.
  • Also, I handled insulation and scaffold material, installed pipe insulation and insulation blankets.

Education

Some College (No Degree) - Mechanical Drafting Technology

Lee College
Baytown

Some College (No Degree) - Process Technology

Lee College
Baytown, TX

High School Diploma -

Ross S. Sterling High School
3234 Baker Rd Baytown, Tx 77521
2002

Skills

  • Calibration and testing of pressure, temperature, flow, and level instruments
  • Troubleshooting instrumentation and control system malfunctions
  • Reading and interpreting P&ID drawings, wiring diagrams, and schematics
  • Documentation of calibration results and maintenance activities in compliance with standards
  • Familiarity with industrial communication protocols (HART)
  • Understanding of process measurement and control principles
  • Ability to perform work in confined spaces and elevated areas using rope access methods

Certification

· 40 Hour Scaffold Competent Person (April 2006)

· IRATA/SPRAT ROPE ACCESS Level 1 (September 2014)

· IRATA/SPRAT ROPE ACCESS Level 2 (October 2015)

· IRATA/SPRAT ROPE ACCESS Level 3 (January 2017)

· NCCER Insulation (October 2015)

· 40 Hour Radiation Safety (October 2015)

· UTT Level 2 (June 2017)

Timeline

Rope Access NDT Technician

Team
01.2022 - Current

Rope Access NDT Technician

Team Industrial Services Inc
01.2022 - Current

Building Inspection Specialist

Goose Creek CISD
10.2020 - 08.2021

Rope Access Site Lead

PetroChem Inspection
01.2019 - 01.2020

Rope Access Level 3 NDT Crew Lead

Acuren Inspection
05.2018 - 12.2018

Rope Access Site Supervisor

Team Industrial Services Inc
05.2017 - 05.2018

SPRAT/IRATA Level 1 Tech

Acuren Inspection
09.2014 - 05.2017

Scaffold General Supervisor

Mobley Industrial Services
05.2013 - 08.2014

Scaffold Supervisor

Performance Contracting Inc
01.2012 - 05.2013

Scaffold Supervisor

Brand Energy & Infrastructure
06.2011 - 01.2012

Austin Industrial

01.2011 - 06.2011

Mobley Industrial Services
04.2010 - 12.2010

Performance Contracting Inc
02.2010 - 04.2010

United Scaffolding
01.2009 - 01.2010

Scaffold Superintendent

L & H Services, Inc
09.2007 - 02.2009

Scaffold Specialist. Crew leader

Miken Specialties
05.2007 - 07.2007

Protherm Services
12.2006 - 05.2007

Foreman

I & I - Insulations Incorporated
01.2006 - 12.2006

Scaffold Journeyman

Mobley Industrial Services
10.2005 - 01.2006

EMSI
11.2003 - 09.2005

ASI - Anderson Industrial Services
07.2003 - 10.2003

PCI - Performance Contracting, Inc
10.2002 - 06.2003

High School Diploma -

Ross S. Sterling High School

Some College (No Degree) - Mechanical Drafting Technology

Lee College

Some College (No Degree) - Process Technology

Lee College