Qualified to design and install mechanical or thermal equipment, select their component, specify materials, costs and execution time. Plan and direct operations of manufacture and maintenance of machines. Evaluate and optimize energy conversion processes.
Knowledge and ability to properly perform, record, and report the results of basic laboratory procedures related to the determination of concrete compressive and flexural strength. On-site experience in which directly observed, inspected, and recorded the full installation of drilled shafts and driven piles.
Detail-oriented Inspector offering 6 year background checking incoming and outgoing materials and products for conformance. Familiar with quality testing instrument and gauges. Hardworking individual skillful in conducting accurate visual and measurement tests and preparing and maintaining comprehensive inspection reports and records. Team player committed to collaborating and working cross-functionally to meet all milestones and schedules.
Software: Microsoft Office, Warrior 8 Languages: Spanish / English
Auger Cast Pile Computer Based Training
HW-380 107 Multi-Family Development - 8 Clans Replacement observing, inspecting, and recording the full Construction of the project. Edgar Bustillo, (305) 432-8546, Seminole Tribe of Florida (STOF) Tribal Community Development 08/22/2022 - Present
HW-380172 Seminole Park Phase III Homes (RV Hide-Away Area) observing, inspecting, and recording the full Construction of the project. Edgar Bustillo, (305) 432-8546, Seminole Tribe of Florida (STOF) Tribal Community Development 08/22/2022 - Present
E4S44 - FIN 409354-2-52-01 Broward I-95 Express lanes Phase 3C, observing, inspecting, and recording the full installation of drilled shafts and driven piles for bridges foundation., Leo Villegas, (561) 334-9239, Archer Western, 04/01/19 - 08/22/2022
E6J53 - FIN 423126-1-52-01 SR-836/I-395 Reconstruction Design, observing, inspecting, and recording the full installation of drilled shafts, auger cast pile and driven piles for bridges foundation., Lazaro Amador, (786) 334-3612, Archer Western, 04/01/19 - 08/22/2022
AS343 - FIN 439228-2-58-01 Indian Creek (SR A1A) - Phase III, observing, inspecting, and recording the full installation of drilled shafts and driven piles for miscellaneous., Christian Bottome, (954) 382-5512, Ric-Man, 05/01/21 - 08/22/2022
T6526 - 441672-1-52-01 SR-90 / SW 8th St at SW 17th Ave, observing, inspecting, and recording the full installation of drilled shafts for miscellaneous., Ernesto Fernandez, (954) 368-2975, Signal Technology, 06/01/20, 04/30/21