Experienced and dependable *Lead Electrical & Instrumentation Foreman* with a strong background in large-scale industrial and commercial projects, including oil & gas facilities and data centers. Proven success on high-profile projects such as *VG-CP1, VG-PLNG, BIG FOOT, JACK ST. MALO*, and the *Microsoft Data Center*. Skilled in supervising crews, planning work scopes (in collaboration with *BAKER HUGHES* and *Honeywell*), and executing electrical/instrumentation tasks from start to finish—cable pulling, tray installation, terminations (220V, 280V, 480V), lighting systems, and heat tracing.
Experienced in coordinating with clients like *VG, KZGB, and Zachry*, leading system walk-downs and closeouts, and ensuring full material accountability. Also the owner of a *Lake Charles–based handyman/remodeling business*, managing residential projects including *bidding, electrical work, drywall, painting, and cabinet installation*. Recognized for leadership, precision, and a strong commitment to Safety dynamic Lead Foreman with MMR Group, recognized for enhancing workflow efficiency and achieving project milestones under stringent safety standards. Bilingual in Spanish and English, I excel in team leadership and client collaboration, driving successful electrical installations and mentoring junior staff. Proven ability to implement process improvements and ensure compliance with quality protocols.
Oversaw inventory management, ensuring timely procurement of materials and tools for projects.
*Lead Foreman – Electrical
*Project: LTS Blocks PTS-SSIV*, AGRU*&MRU*
*Company: MMR
*Dates: OCTOBER 2023- OCTOBER 2025
- Served as *Lead Foreman* overseeing electrical and instrumentation work across multiple blocks.
- Conducted walk-downs and system closeouts directly with clients including *VG, KZGB, and Zachry* to ensure compliance and readiness.
- Maintained full accountability of materials by personally opening and verifying crates related to assigned systems.
- Oversaw planning and execution of work scopes in alignment with *VG* *BAKER HUGHES* requirements, ensuring successful completion of all blocks.
- Directed teams in the installation of cable trays, cable pulling (power and instrumentation), terminations, heat tracing, and full lighting systems.
- Ensured accurate and on-time delivery of project milestones under high standards of safety and quality control was recognized by VG FOR THE BADGE OF EXCELLENCE
Thanks
First technician assigned to cable pulling operations for LTS Blocks 1–3
- Transitioned to PTS, where I led cable tray installations and cable pulling for both power and instrumentation systems.
- Performed terminations on power supply panels and emergency panel boxes.
- Worked with a wide range of instrumentation including:
*LIT, LI, PIT, UY, XY, TIT, FIT, LV, ZFD, ZMC*.
- Responsible for all heat tracing work across SSIV and AGRU.
- Upon completion of PTS, reassigned to LTS Blocks 5–18 to lead lighting system installations across key units:
*MR Compressor, Surge Vessel, Cold Box, E-House, Walkways & Stairways.*
- Installed and wired 52 lamps per block, handling both *emergency* and *normal circuits*. Megg and test all cables and lamps before installation
-
- Focused on terminations of *220V, 280V, and 480V* power cables of various sizes.
- Used a variety of dies and *C-crimp power tools* to ensure proper and secure connections.
- Maintained high safety and quality standards in a fast-paced data center environment.
- Collaborated with team members to meet tight deadlines and ensure system reliability.
Conducted cable pulling to ensure proper connectivity.
Installed cable tray
Terminations of power and control equipment
*Electrical Technician B*
*Project: VG CP-1*
- Installed and supported *cable tray systems*, including layout, mounting, and routing.
- Performed *grounding* installations to meet safety and project specifications.
- Conducted *terminations* for power and control systems with accuracy and adherence to standards.
- Assisted in the *Fire & Gas detection system* installations and terminations, ensuring proper integration and functionality.
- Maintained consistent safety practices and supported timely progress of electrical systems during construction and commissioning phases.
1. Reading blue print tracing cable pull . Making sure we are pulling the correct cable hi voltage ,low voltage or instrumentation
-Placing coworkers where the wire is going to be pulled thru
- placing cable in a uniform fashion
- tying cable down with metal tie stramps
2. Installing cable tray
- mesuring and cutting cable tray where
Cable runs thru
1.Insulater installing insulation hot or cold pipe ranging from 3/4 in - 20x30 or more
2.metal mechanic installing metal sheet on to pipe
3.steam tracing Opening and closing lines relief troubleshoot
4. JSA -in charge of filling out or job safety analyze report
Use of hand & power tools such as : industrial Scissors , blade cutter , calculator, divider , compass ,hammer ,nippers ,wrenches , electric drill ,
- Gather up and assemble a great team make sure everyone in my team understand what it is that they are doing .
-come up with a plan so we can perform our job correctly and safely always work together. Place coworkers in there more suitable place of work
-Gather all material that is need to erect scaffold
-Do a proper house keeeping leaving working area clean and hazardous free
Basic word ,power point , excel
Fluent in Spanish and English read and write