Engineer bander imam petrochemical company
Bandar-e Mahshahr, Khuzestan
06.1995 - 11.2013
Repaired and maintained PVC substances ,cooling system and wastewater
Monitored the temperature, pressure, and levels of various equipment
operate of the pumps and compressors and polymerization process in reactors.
Assisted in troubleshooting issues related to product design or manufacturing processes.
Developed and implemented engineering strategies to improve production efficiency.
Provided support during the installation, maintenance, repair, and calibration of equipment.
Documented all engineering activities according to established procedures.
Participated in team meetings to discuss project progress updates.
Prepared estimates and budgets.
Created accurate project specifications, documenting in technical manuals.
Conducted analyses addressing failure, reliability or yield improvement.
Conferred with technical personnel to prepare designs or operational plans.
Calibrated scientific or technical equipment.
Performed testing to determine functionality or optimization.
Fulfilled orders by successfully planning, budgeting, and coordinating projects.
Analyzed design or requirement information for equipment or systems.
Generated engineering documentation and oversaw design projects.
Determined design criteria or specifications.
Advised customers on use of products or services.
Show Description