Summary
Overview
Work History
Education
Skills
References
Timeline
Generic

Michael Phillips

Yucaipa,CA

Summary

I have achieved a vast experience in the construction industry, and have honed a wide spectrum of skills in the construction trade. To this I add " my personal touch" & approach, that results in client, inspector confidence, and trust, always taking into consideration what each individual client & project requires.

Overview

11
11
years of professional experience

Work History

Superintendent

KPRS Construction
07.2021 - 11.2022

The Depot Office building project is a 77,000 sf. core and shell situated over a parking garage podium, with two subterranean parking levels. The 149,000 sf. 3 story building, includes common areas and exterior patio's on 2 floors. The project was designed and built, with sustainable materials and open, flexible office space for future tenants.

Superintendent

KPRS Construction
04.2020 - 07.2021

Red Car is a design build project partnered with the owners in house architectural firm. It is a creative mixed use concrete four level design, with a ground floor retail space, Much like an artist studio concept, the floor to ceiling window creates a bright and open environment. This project was built using a "board form" concrete finish design, on all interior and exterior walls, columns, planters, etc. The upper level designed with an inverted butterfly roof, concept, complete with steel & hardwood exposed finishes.

Superintendent

KPRS Construction
02.2019 - 04.2020

Entrada is a 300,000 sf. eleven story creative and mixed use office building. One of its marquis featured designs, is that each office has an indoor/outdoor work environment. The sky bridge level offers outdoor views of the beautiful surrounding city, as well as fire pits, lawn and sand games, and yoga classes all hours of the day. This building has six stories of office space above the sky bridge level, and is located over 5 levels of parking Garage with 2 being subterranean. Lastly, there is a huge decorative exterior steel mural which adds to this buildings unique overall design.





Superintendent

KPRS Construction
10.2017 - 02.2019

The Mindanao creative office project, involved the remodel and major facade transformation of the current 3-story building into a creative complex for future tenants. The new exterior facade is comprise of 5 different panel types, all manufactured in Switzerland. The interior features more open collaborative spaces, with 17' tall open ceilings finished with custom wood flooring from Germany. Over 15,000 sq. ft. was added to building, and 22,000 sq. ft. of T.I. space was completed. The site received full landscaping upgrade, complete with a rain water cistern harvesting system.

Superintendent

The Roberts Group
02.2017 - 10.2017

Kelton Apts. was a Spanish themed 48 door student housing podium style project, featuring a custom pool deck, gym, high end lobby over a 3 level subterranean parking garage. The rooms are catered to the high-end clientele including, all students having their own personal wall safes, full kitchens, and expansive living spaces. The roof level feature a full garden, with teak hardwood walk ways, complimented with water pools and steams zig zagging throughout the location.

Superintendent

HBC
2016 - 2017

This was an existing 8 story office building, and separate 5 story parking structure full renovation. The scope included new deco style lobby, with a 2 story structural glass entrances connected to steel portal entrances, finished in an exterior track tile system. All new finishes in all common area baths, (all floors) mech. systems, new elevator facades, flooring and landscaping. The challenge with this project, was not to disrupt the 1,000 existing tenants, occupying all floors in the building, while constructing this tightly schedule driven project.

Superintendent

R.D. Olson Construction
01.2015 - 02.2016

This 8 story-250 rm. Luxury Hotel & Spa features a Balinese inspired Spa, expansive custom designed pool, area, and signature restaurant, with a roof top bar, and expansive views of the Pacific Ocean. Additional public spaces include: 25,000 SF of event space, including a 8,700 SF ballroom, 6,000 SF event lawn, 10 meeting rooms, "a social room", with a built in bar, and finally the blend cafe'.

Superintendent

R.D. Olson Construction
04.2014 - 01.2015

The Strathmore project was a 5-story student housing project, consisting of 31 contemporary podium style units, built above 2 levels of subterranean parking garage. This project was situated on a corner lot with a very tricky multi-grade parcel of land. Finally it feature exposed floating structural steel hall/walkways, and was finished with custom exterior cementous facade panels.

Superintendent

R.D. Olson Construction
09.2013 - 04.2014

This was an 8 story 140,000 SF mid-rise hotel with pool, spa, Bistro bar/lounge, market, 5,000 SF of meeting space, excessive room, and a 7,500SF ballroom. This hotel was located adjacent to the Irvine Spectrum, which offered shopping, and restaurants to the hotel guests.

Superintendent

Driver Special Projects Group
03.2013 - 09.2013

This project consisted of a updated high end main lobby bathrooms, full bar remodel, mini lounge, and coffee bar. It was detailed project that demanded strict sound requirements, and cleanliness as this was a fully functioning open Hotel.

Superintendent

Driver Special Projects Group
05.2012 - 04.2013

This project was an existing Historical Building located off campus in East Los Angeles. It was a full renovation built for the construction management division, complete with offices, and boardrooms. This building was shared by the USC police force, including a separate SAFE "Kevlar lined wall finish room" used for gun cleaning. The third section or tenant was a division of the hazmat containment facility. Per the city's Fire Dept, and 50,000 gallon secondary storage tank was required, as precaution in the event of the facility having a fire. This huge underground tank was placed in the existing parking lot approx. 25' below grade.

Superintendent

Driver Special Projects Group
02.2011 - 10.2012

Various other projects include:

  • Cal-Baptist University/Riverside, Ca.
  • Incipio Technologies/Irvine,Ca.
  • Cedar Sinai Distribution Center remodel/T.I.
  • BSH Design Center 33 Mock up Kitchens/Irvine, Ca.
  • Macy's Remodel/San Diego, Ca.

Superintendent

Pacifica West Construction
2009 - 2010

Projects include:

  • Star Bucks/Brea, Santa Ana,
  • Del Taco/Rancho Cucamunga
  • Sinclair Paint structural retro-fit/City of Industry,CA.
  • Site Project/Upland CA.


Superintendent

Howard CDM
2007 - 2009

These projects include:

  • Mateo Street 33 lofts in the historic garment district./Los Angels, Ca.
  • Enclarity existing 6 story BLDG. multi-floor T.I. Projects/Irvine, Ca.
  • Hollywood Heights Hotel main bar, & restaurant remodel/Hollywood,Ca.

Superintendent

Timberwolff Construction
2005 - 2007

This was a T.I. Based company consisting only of retail construction. Each project was fast/schedule driven projects. I was in the A list division as this only consisted of high end clients which included:

  • Juicy Couture
  • Lucky Brand Jeans
  • Verizon
  • Luis Vuitton
  • Sigrid Olsen
  • Bed Bath & Beyond
  • Hollister

Superintendent

Dolan Construction
2001 - 2004

Most projects I built were ground up builds. This is a list of the projects I worked on:

  • Hollywood video/All over Ca.
  • DelTaco/Realto, Ca.
  • Chevron Gas Station & mini market/Chino Hills, Ca.
  • Nordahl Market place-Cold Stone Creamery, WalMart, Guitar Center, etc./Escondido,Ca.
  • Several Core & shell Buildings

Superintendent

Gleadson/Cashman Construction
1998 - 2001

Mainly a T.I. Based Company with several larger Clientele

  • Toys-R-Us several stores all of the Southwest which included: NM., TX., LA., AZ. CA.
  • Payless Shoe Source/Ca. NV., AZ., TX.
  • Footlocker/Hollywood, Ca.
  • Best Price Fashions, several store in Ca.
  • Taco Bell CA, AZ.

Superintendent

Coury Enterprises
1996 - 1998

This was a volunteer retro-fit project. It consisted of 6 separate 4 story condominiums building over 2 level parking garages. We had to install all of the missing sheer walls & hold downs systems, that were never originally installed when these buildings were built. It was a two and half year project, where we needed to remove the tenants in order to install these missing structural members. At the same time maintain the peace with all the remaining/existing people in the other adjacent buildings.

Superintendent

T&C General Contractors
1993 - 1996

This was Two existing 21 story tower high rise building, that required an entire cold water retro-fit. There was a North and South tower, and I was the foreman/Superintendent in charge of the North. There were 12 condominium units per floor. Every water supplied fixture needed to replaced with copper. Further there were 3 subterranean levels that required replacement as well. The project lasted 2+ years

Education

No Degree - Architecture

Saddleback College
Mission Viejo, CA

No Degree - General Studies

Cal State San Bernardino University
San Bernardino, CA

Skills

My ability to problem solve in an expeditious manner, has led to projects being completed on schedule, under or to budget demands, with the highest degree of client satisfaction

References

Professional references:

  • Corey Evans- Partner/Sr. P.M. KPRS Construction-714-225-4723
  • Sean Wisner-J.R. Partner/Sr. P.M. KPRS Construction-714-381-2432
  • Scott Poston-Owner United Electrical-310-339-8921
  • Craig Heising-Sr. Superintendent/Milender White Construction-949-892-7258
  • Byron Olson-Superintendent/ARCO International-314-753-4722


Personal References:

  • Gregg Gill-friends for 47 years-714-586-6861
  • Alan West-friends for 34 years-805-807-2924
  • Steve Ziegler-friends-33 years- 928-575-7840

Timeline

Superintendent

KPRS Construction
07.2021 - 11.2022

Superintendent

KPRS Construction
04.2020 - 07.2021

Superintendent

KPRS Construction
02.2019 - 04.2020

Superintendent

KPRS Construction
10.2017 - 02.2019

Superintendent

The Roberts Group
02.2017 - 10.2017

Superintendent

R.D. Olson Construction
01.2015 - 02.2016

Superintendent

R.D. Olson Construction
04.2014 - 01.2015

Superintendent

R.D. Olson Construction
09.2013 - 04.2014

Superintendent

Driver Special Projects Group
03.2013 - 09.2013

Superintendent

Driver Special Projects Group
05.2012 - 04.2013

Superintendent

Driver Special Projects Group
02.2011 - 10.2012

Superintendent

HBC
2016 - 2017

Superintendent

Pacifica West Construction
2009 - 2010

Superintendent

Howard CDM
2007 - 2009

Superintendent

Timberwolff Construction
2005 - 2007

Superintendent

Dolan Construction
2001 - 2004

Superintendent

Gleadson/Cashman Construction
1998 - 2001

Superintendent

Coury Enterprises
1996 - 1998

Superintendent

T&C General Contractors
1993 - 1996

No Degree - Architecture

Saddleback College

No Degree - General Studies

Cal State San Bernardino University
Michael Phillips