Dynamic and detail-oriented professional with experience at Walmart Associates, Inc., excelling in time management and complex problem-solving. Proven ability to enhance customer satisfaction through effective communication and efficient order fulfillment. Skilled in inventory management, contributing to a seamless shopping experience while maintaining high standards of cleanliness and organization.
In this job I have to put different parts of underbody warming blankets to the blankets and folding it according to comapnays guidelines and procedures. After folding the warming blankets i have to put the blankets in the storage cart and make packing of it, with extraordinary cleanliness and hygiene by wearing nitrile gloves, hair net and aprons.
This Job Includes Four Stage of Works.
(1) In first stage of work i have to check the first come first base customer order and then pick up all the items of customer order from the whole store , which includes Bakery items, Grocery Items, Fruits, Vegetables, General Merchandise.
(2) In second stage of work i have to store all the picked up items in the backroom according to its requirements like frozen items are stored at freezer, chilling items are stored at refrigerated coolers, General Merchandise in the located place.
(3) In third stage of work i have to check which customers are came at the pick up parking spot of online shopping and according to that i have to prepare the whole order of one customer from the different storage locations and simultaneously prepare the order of three or two customers which one are delivered by the spark drivers of walmart.
(4) In this fourth stage of work i have to deliver the prepared order of one customer or two or three customer order to the car where they are parked in the allocated parking lot to the trunk or back and front seat of the car.
In each day of every week i have to perform anyone stage of above four ones.
# As a Consulting Civil Engineer Development Permission ( Permission to start the construction) and Building Use permission are obtained on behalf of Builder or Personal Plot Owner.
# Builder and Personal plot owner approaches for DP and BU permission for Residential, Commercial, Educational, Farm Houses (Weekend Homes), Sports Activity center, Personal Bungalow, Sub plotting schemes, Bungalow schemes.
# After Finalizing the whole project work with Builder or Personal plot owner preparation of application forms, all bonds of authority are going under process.
# After receiving the autocad drawing file of the project from the architect of the builder detailed scrutiny of the drawing is done as per the General Control Regulations of the local Authorities.
# Joint Meeting is done with builder and architect for any requirements, additions, alterations to fulfill the laws of GDCR.
# After receiving the final drawing with corrections from the architect with the concern of builder Final layout, Building plans, Parking area calculation plan, Basement Plan, Fire authority approval plans are going under process for the final submission Drawings.
# After Completion of final drawings set and all documents the whole project case submission work to the authority is done and by continuous follow up with authority scrutiny engineers and higher officers the procedure to get the development permission is done.
# During construction at different construction stages like basement slab, plinth level, different floor level progress report submission is done to the authority and joint site visit is donw with authority engineer and higher officer for the ongoing construction work to confirm the ongoing construction work is done as per the approved plan and the bylaws.
# After Completion of the construction work the same procedure is done to get the building use permission of the building.
About GUDA : Gandhinagar Urban Development Authority works under Gujarat Urban Development and Urban Housing Department of Government Of Gujarat, UDD is responsible for urban development and housing policy.
Gandhinagar is Capital City Of Gujarat State.
# Duty Of Planning Assistant :
#As a Planning Assistant collecting local area data, survey of existing structures, collection of ownership data of lands and be a part of preparation of Town planning Schemes.
# As per Guda authority checklist registered Civil Engineer, Developer can Submit the whole set of application form, all related bonds, Layout plan, Building Plan, Basement Plan, Car parking calculation plan, Fire Plan, Built up area calculation plan, Fsi plan. As a planning assistant has to check all documents, bond and all plans according to General Control Development Regulations of the Guda authority booklet and put forward to next table for approval of plan and release Development Permission latter ( Permission to start the construction) for Residential , Commercial, Educational buildings, Farm Houses ( Weekend Homes), Row houses, Sports activity centre, Storage, Godawn, Ice factory, Sub plotting schemes, Bungalows schemes etc.
# Builder or Developer can start the construction work after getting the development permission, they also submit progress report of the construction at the different stages of construction and we also visit the site and check that ongoing construction is in progress as per the approved plan.
# After completion of such building construction, a Registed engineer or Builder Or Developer can submit all plans with Lift Noc, Fire Noc, Site photographes with the buildings, Percolating wells, Tree plantation and planning assistant again visit the complete site and check all parameters as per the approved plan and norms and again the file moves to the next stage for approval of Building use Permission Latter.
# Supervision of Lineout, Excavation, Concreting Of Foundation, Formwork Of Colums, Beams, Slab, Steel detailing of all frame structural members, Casting of slabs with proper concrete grades.
# Material management, Arrangements of different on coming stages of construction with different construction agencies in co-ordination with senior engineer, architect, structural engineer.
# Weekly reporting of site progress report to senior engineer.
# Material testing is also carried out to check the quality of material as well as concrete and other members.