Summary
Overview
Work History
Education
Skills
Timeline
Generic

Justin Parker

Summary

Adept at project management and mechanical troubleshooting, I significantly enhanced operational efficiency at Humm Foods by implementing process improvements and preventive maintenance programs. My strong leadership and attention to detail fostered robust client relationships and team productivity, achieving notable gains in repeat business and operational excellence.

Professional technician with high standards and focus on achieving results. Skilled in troubleshooting, repair, and preventive maintenance for variety of systems and equipment. Strong team collaborator who adapts to changing needs and ensures reliability. Known for problem-solving abilities, mechanical aptitude, and effective communication skills.

Overview

29
29
years of professional experience

Work History

Owner

Weldon Fabrication
04.2021 - 03.2024
  • Managed day-to-day business operations.
  • Developed and maintained strong relationships with clients, resulting in repeat business and referrals.
  • Interacted well with customers to build connections and nurture relationships.
  • Trained and motivated employees to perform daily business functions.
  • Oversaw daily operations, ensuring all tasks were completed accurately and efficiently by team members.
  • Streamlined operations to improve efficiency, enabling more time to be spent on strategic planning and decisionmaking.

Lead Foreman

Overall Construction & Maintenance
02.2012 - 03.2021
  • Organized and delivered supplies for each job.
  • Assigned tasks and monitored completion of work to full satisfaction of company standards and customer requirements.
  • Provided training and mentorship to junior team members, enhancing their skills and increasing overall productivity.
  • Conducted thorough quality control inspections to identify issues early on, preventing costly rework or delays later in the project timeline.
  • Established strong relationships with clients through consistent communication and transparency, resulting in repeat business opportunities.

Plant Engineer

Humm Foods
01.2000 - 11.2006
  • Improved plant layout design to maximize space utilization and increase overall productivity.
  • Developed preventive maintenance programs, reducing equipment failures and increasing overall reliability.
  • Coordinated with outside contractors for specialized services, ensuring timely completion of tasks within budget constraints.
  • Enhanced plant efficiency by implementing process improvements and equipment upgrades.
  • Led root cause analysis efforts to identify recurring problems and develop long-term solutions.
  • Optimized production rates by analyzing equipment performance and implementing necessary adjustments.
  • Developed products and prototypes for various types of product designs.
  • Performed concurrent design and manufacturing engineering and other functions to reduce time required to bring product to market.
  • Designed custom tools or fixtures when required, enhancing worker safety and job efficiency.
  • Evaluated new technology options for potential integration into existing processes, increasing efficiency while maintaining quality standards.
  • Worked effectively in fast-paced environments.
  • Skilled at working independently and collaboratively in a team environment.

Maintenance Technician

White Wave
07.1995 - 09.2000
  • Performed electrical and mechanical repairs of production equipment to minimize downtime.
  • Used problem-solving skills to alleviate issues efficiently with minimal supervision.
  • Completed partial or full dismantling of equipment to quickly repair or replace defective components and restore functionality.
  • Completed daily, weekly, and monthly checklists on building equipment to maintain records of scheduled maintenance procedures.
  • Troubleshot equipment breakdowns and performed preventive maintenance.
  • Inspected and maintained equipment to keep items in top working condition.
  • Operated varied hand and power tools to complete repairs.
  • Improved equipment functionality by conducting regular maintenance checks and repairs.
  • Successfully completed complex repair tasks within tight deadlines, minimizing disruptions to daily operations.
  • Followed safety protocols to minimize workplace accidents.
  • Utilized variety of tools and test equipment to troubleshoot and diagnose equipment malfunctions.
  • Conducted regular inspections of equipment to promptly identify issues that could cause machinery malfunctions.
  • Inspected, tested and adjusted mechanical and electrical systems to facilitate proper functioning.
  • Rewired and replaced faulty electrical components in equipment.
  • Repaired and replaced pumps, valves and motors.
  • Performed preventive maintenance and repairs on various types of equipment.
  • Detected and repaired machinery faults using electrical and manual testing methods.
  • Followed work orders and specifications for machine and equipment replacement, repair, or maintenance.
  • Ensured smoother operations, maintaining accurate records of all maintenance activities.
  • Completed preventive maintenance on machines to enhance production and maintain quality.
  • Optimized production line performance, troubleshooting and fixing issues promptly.

Education

GED -

Standley Lake High School
Westminster, CO
05-1997

Skills

  • Project management
  • Operations management
  • Attention to detail
  • Quality assurance
  • Preventive Maintenance
  • Mechanical troubleshooting
  • Electrical troubleshooting
  • Mechanical repair
  • Equipment Repair
  • Parts replacement
  • Lockout and tagout procedures
  • Industrial equipment
  • Hydraulic systems
  • Electrical panels
  • Mechanical expertise
  • Mechanical aptitude
  • Pneumatic systems
  • Control circuits
  • Variable frequency drives
  • Conveyor systems
  • Boiler maintenance
  • Steam systems
  • Water treatment
  • Maintaining components
  • Plumbing repair
  • Equipment troubleshooting
  • Critical thinking

Timeline

Owner

Weldon Fabrication
04.2021 - 03.2024

Lead Foreman

Overall Construction & Maintenance
02.2012 - 03.2021

Plant Engineer

Humm Foods
01.2000 - 11.2006

Maintenance Technician

White Wave
07.1995 - 09.2000

GED -

Standley Lake High School
Justin Parker